West Red Lake Gold Mines Ltd banner
CAD
Metric FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025
(60k) (510k) (180k) (150k) (230k) (180k) (190k) (33m) (115.8m) 501k
— — — — — — — 250k 1.7m 2.4m
— — — — — — — — 5.4m 5.2m
— — 30k 0 — (20k) 0 4.1m 16m 28.2m
— — — — — — — — 3.5m 9.8m
(20k) 450k (450k) 0 0 0 (10k) 2m 17.5m (28.2m)
(80k) (60k) (610k) (150k) (220k) (200k) (200k) (26m) (80.6m) 2.8m
0 — — — — — — (190k) (7.2m) (73.4m)
— — — — — 20k (170k) (4.2m) (10k) —
0 — — — — 20k (170k) (4.4m) (7.2m) (73.4m)
— — 3.2m 20k 0 — — 48m 68.4m 67.8m
— — — — — — — (100k) 48.8m 22.6m
0 — — — — — — (3.1m) (8.9m) (14.2m)
0 — 3.2m 20k 0 — — 45m 108.3m 76.2m
— — — — — — — — (9.6k) —
(80k) (60k) 2.6m (130k) (220k) (180k) (380k) 14.6m 20.6m 5.6m
(80k) (60k) (610k) (150k) (220k) (200k) (200k) (26.2m) (87.8m) (70.6m)