West Red Lake Gold Mines Ltd banner
CAD
Metric FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025
0 0 0 0 0 0 0 0 0 103.4m
— — — — — — — — — (56m)
— — — — — — — — — 47.4m
(60k) (510k) (150k) (200k) (250k) (200k) (230k) (32m) (104.6m) (24m)
(60k) (510k) (160k) (200k) (250k) (200k) (230k) (9.3m) (18.3m) (18.8m)
R&D
— — — — — — — — (84.7m) (3.1m)
— — — — — — — (250k) (1.7m) (2.2m)
— — — — — — — (22.4m) — —
(60k) (510k) (150k) (200k) (250k) (200k) (230k) (32m) (104.6m) 23.4m
— — — 50k 20k 10k 40k — (13.3m) (22.9m)
— — — — — — — 10k 6m 1.1m
— — (30k) 0 — — — — (126.5k) —
— — — — — 20k 0 — — —
— — — — — — — (260k) 2.3m 49k
(60k) (510k) (180k) (150k) (230k) (180k) (190k) (33m) (115.8m) 501k
(60k) (510k) (180k) (150k) (230k) (180k) (190k) (33m) (115.8m) 501k
(60k) (510k) (180k) (150k) (230k) (180k) (190k) (33m) (115.8m) 501k
(0.01) (0.08) (0.01) (0.01) (0.02) (0.01) (0.01) (0.30) (0.45) 0.00