HKD
Metric FY2016 FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025
23.9B 41.2B 40.7B 45B 13.4B 15.6B 10.6B 29.5B 36.2B 40.2B
(12.4B) (22.3B) (20.5B) (22B) (6.5B) (7.4B) (4.6B) (13.2B) (16.2B) (17.6B)
11.4B 18.8B 20.2B 23B 6.9B 8.2B 6B 16.3B 20B 22.6B
(10.4B) (15.2B) (15.9B) (17.7B) (14.8B) (13.2B) (12.1B) (14.4B) (16.3B) (17.3B)
(7.1B) (7.7B) (8.3B) (8.9B) (7.3B) (6B) (5.6B) (8B) (9.4B) (10.3B)
R&D
(689k) — — — — — — — — —
(3.3B) (4.9B) (5.2B) (6.1B) (5.7B) (5.4B) (4.6B) (4.4B) (4.5B) (4.4B)
18m (2.5B) (2.5B) (2.8B) (1.7B) (1.8B) (1.9B) (2B) (2.4B) (2.6B)
1.1B 3.7B 4.3B 5.3B (7.8B) (5B) (6.1B) 1.8B 3.7B 5.3B
(1.5B) (1.8B) (2.2B) (2.8B) (3.8B) (2.3B) (3B) (3.9B) (4B) (3.8B)
1.8B 2B 2.2B 2.7B 2.8B 2.8B 3.1B 4.1B 4.1B 3.8B
10.4B (501.4m) (350.3m) (574.2m) (528m) (404.9m) (627.6m) (1.2B) (1.1B) 239.8m
— (264m) (198.8m) (117.3m) (170.1m) (234.9m) (225.3m) (200.4m) (214.8m) (232.3m)
9.9B 1.1B 1.6B 1.8B (12.3B) (7.9B) (10B) (3.4B) (1.6B) 1.6B
(38.2m) (67m) 38.1m (65.9m) (32.9m) (43.3m) (5.6m) (98.4m) (48.6m) (39.8m)
9.9B 1.1B 1.6B 1.8B (12.4B) (7.9B) (10B) (3.5B) (1.7B) 1.5B
475.2m (588.4m) (1.1B) (1.1B) 6B 4.1B 4.9B 1.8B 899.1m (479.2m)
10.4B 474.1m 522.6m 689.8m (6.3B) (3.8B) (5.1B) (1.7B) (784.6m) 1.1B
6.72 0.30 0.33 0.45 (4.19) (2.52) (2.54) (0.86) (0.39) 0.49