Prepared remarks
Felipe Gazitua L.
Management
Good morning, everyone, who's sharing with us. I see that we have people connected online. Today, I'm going to be your host. My boss, Nicolas is in Japan at the moment. So he won't be able to be here.
Currently, so we haven't met for about 2 months by now. So I would say that we have been working on what we have been doing in these last 2 months. So we have certain news from the last 2 months. And we're going to be inspecting the financial markets. The losses in the last year were reduced and the current losses are related and are explained by the mining business and in the industrial segment. And the industrial segment is quite better than what it was -- than how it was in past periods. We have been suffering with the experience of Phase 5 of the Los Colorados. That's the reason behind the current results.
Now CMP reported losses of USD 5.9 million. That compares with $5.6 million positive in last year. This impacted -- this was impacted by the contingency at Los Colorados and the lower market prices in the last quarter.
In the Industry segment, we saw a loss of $19.8 million that was compared with $49.5 million in the previous year. From those -- about near 2010 are related with the expenses by Huachipato. This is significantly less than the last month -- in the last quarter. So Huachipato started dividing its expenditure. Huachipato has this fixed expenses that -- and this is going to have -- it's going to require some time to reach ATM. We are hoping to see in 2027 more positive perspective. What are we hoping to see on the market. It's incredible to see how the iron prices has established. We thought it was going to be reduced after the Liberation Day, but iron has been quite resilient.
It is quite below the price of the same volume than last year, but it makes sense. And regarding IMACON, it has stabilized. Remember that it isn't really relevant because we have been -- we're building through Cintac. So this was stabilized after 3 years of decline, it has established and has remained in below historical levels. Good news here despite this Cintac refocused its efforts and refocused its business, and it's having better margins and better results on the bottom line compared to last year. And the other positive point is that we have been seeing an increased interest in mining. We might be seeing problems regarding choosing the projects that we have to do.
And regarding the financial results, we are going to do a very broad overview and consolidated EBITDA decreased from $112.8 million to $107.9 million mainly explained due to the mining segment that had lower shipments. It was a reduction of production and shipments. We had to delay on a couple of ships, and we also faced lower prices. On Industrial segment, the EBITDA has improved. And I wanted to highlight this due to the increased efforts on performance by Cintac, which is an increase of USD 3.2 million from Huachipato as well. This is partially offset by TASA. As I will mentioned before, later, Argentina isn't having the recovery that we saw forecasted. But the margins have been tighter. They have been removing tariffs.
The steel cost was reduced and the margins are then -- lower than expected. So considering that we haven't seen the volumes we expected so far, we have lower margins. What are we having to do on the way forward. Well, I already mentioned that this can't change. We need to solve the contingency at Los Colorados, and we are going to detail on this further down the presentation. And secondly, we need to keep working on building our 2030 execution project. And this has to do with enabling growth, and we need to continue on FEL2 in Los Colorados obtaining the environmental permits for Aclara. We're going to discuss this later. We have been working on a good step. And we closed the contracts for Aguas CAP by April 22, where we signed these contracts. And we have been discussing the developing potential, and we have been working also on Huachipato 2.0 working with all 4 offers and working on logistics and docking processes.
Okay. So let's go to the highlights. And I have already proposed to you just like in early positions -- in early versions. We hope that you can take note of your questions and we can solve them at the end of the presentation. So the highlights, what can we highlight here from these 2 months? Well, as I mentioned before, we closed the buy of 49% of our CAP from Mitsubishi. So we had a 100% participation of the company. And this was shown through -- this was done through a credit operation with Banke DOW. This is a sustainable project and it received the first new label certification in Chile. This is the first for our Chilean company and for a bank in Chile to manage that. And this has been provided to organizations that are looking to protect the oceans and to have sustainable use of water. And this is very well in line with our strategy of being a leader in the handling waters and keeping with the energy transition.
We also have been working on a deeper level here we want to reflect that CAP is officially in a new stage. We have been breaking all the patterns where the company -- Compañía de Acero del Pacífico, which is a very antique company now Grupo CAP is a different company that has a lot of different synergies that point towards different operations and strategies. So this reveals, I would say, this change of direction that we have been seeing so far. This is a sign. Third, we have been working with Huachipato. We made significant agreements here on limestone and coal. We also have been working on optimizing the use of ports and docks and mining operations. And Guarello, we changed the mining operation in order to increase short-term income? This is a small operation that doesn't work 24/7, and it doesn't need such a high scale, so we improved the benefits of income. And its hopeful that we see a higher level of demand here.
Okay. What happened in the market? I think I already mentioned a bit of this. Well, you can see here the Platts price, the Platts cost, and you can see here a quarter versus quarter. And what we haven't seen so far is that the Platts 65% fell 14% slightly more than the Platts 62, which is 16. And this is over 103. And even though Liberation Day was the first -- April 1, it was after -- after this, the value is still somewhat higher than 100 is sustaining so far. We hope to see it holding there considering that China might provide stimuli to the economy because this has increased slightly less than expected. So we can expect to see changes here in the future. We have already shared this so far, this hasn't changed in the first quarter. And we haven't seen here the investment in construction and mining, we should see an increase of, at least 15%, and mining also is going to have an increase. We haven't seen this so far on mining.
And in construction, this is more [indiscernible] increase. What can we highlight here. A slight improvement of IMACON in the first quarter and [indiscernible] is having the record activity here during the first quarter, and this has been pushed by mining and the demand for modular solutions. Hopefully, we will see everything going forward, and this is going to have -- we're going to see this a comparable improvement as with Cintac. In Argentina, things haven't changed as we expected from last year where we see relevant comparison with construction and steel. This is an improvement compared to last year, considering rates and fees. This is relevant, but this is low compared with all the normal years. The margins have been tighter. And this has to do with a lot of different elements, but the steel prices have been reduced.
And this -- and the market expects to see a reduction in costs on different products, but we don't work with certain products from steel. Let's go to the point here for financial results. What happened here? What are the results of the financial reports, what are those? EBITDA fell 8% in the quarter versus quarter, but the income has improved from minus $21 million to minus $13 million. We hope to see these improvements in the future. What are the most important explanations here. First is that the less -- the smaller EBITDA has to do with the mining sector that reduced that fell 7.9% year-over-year. This is explained due to a decrease in prices quarter-by-quarter and also by smaller shipments that has to do with the contingency in Colorados.
To be more precise, there is less production from Colorado and due to less shipments. So we had a stock to tackle that. Well, we have been facing the impact in Colorado. We hope to see that solve in the future. This is a temporary offset. We have been seeing a very bad market -- back to market, but this has improved it here. We have [indiscernible] mid-last year, which was negative, but we have 7.7 here.
In the Industrial segment, we see a higher EBITDA compared to last year. Plus 3.3 million year-over-year, and this is mainly due to a higher EBITDA in Cintac which, as I mentioned before, there's change in trends and plus 3.1 million in modular segments and Huachipato, which is no longer losing money in the steel segment. As I mentioned, we have a certain fixed costs related with the hectares that we need to cover with new businesses, and that's part of the work we have been doing so far. And regarding TASA, it's facing some difficulties. But we have a good forecast here. We have been developing with TASA, the sale large duct projects. We have the certifications to work on that. So we hope to see a better future there.
And in the bottom line, we have an improvement because we didn't have steel production this year and this makes an important difference. Let's see -- let's delve deeper into the results. Let's see the income, if you want, if you wish. As we mentioned, mining had lower results in the Industry segment, we have an improvement of 10% of the income basically. And we have an increase of Cintac, the sales of Cintac and TASA that has improved compared to last year, but we haven't seen the results compared to an earlier year. And we have lower average prices. Here, we're going to see the details that I mentioned so far. Total revenue, $432 million, which has increased 8% compared to last year in mining, we see a slight increase that has to do with the impact in back-to-market ambient costs.
Okay. I'm going to see this slide and then we're going to go later. So we have the consolidated EBITDA. The most significant explanation here is it has to do with mining where we see a reduction from $101 million to $93 million. This has to do with higher expenditures. We have $56.6 per ton compared with $47.8 due to Colorados. We saw the [ implication ] for price. And we believe that the production is going to be around 16 tons, this is going to be maintained and sustained. And the price in cash is going -- in cash flow, we should see $52 to $57 per ton, we are going to see a higher level here and is going to see a stabilization in the middle of the year. In the Industrial segment, we have good news.
This is higher, and it has to do with Cintac. We have been working on added value and margins. We haven't seen change in initiatives in the cost and sales, and we have been seeing here an improvement. Do you think that we have been pushing for an increase of the line of flotation, which is going to be a significant change. And in Infrastructure, we see a slide on the difference that we haven't seen in the next semester.
Unknown Executive
Accumulated losses of $30 million for these contracts, the same term last year, one hits us. Here, we have on the mining side because we have $12 million less imported and exported, but also take a look and see what you got. Usually speaking, we had $49 million, now we have minus $20 million. And we're going to be increasing that these $20.5 million interest between companies, and these are cleaner less. This is going to be united the logistics business is going up is going to be covering all these areas and those all these things.
How are we doing finally? The cash position, we are quite similar to what we were in December, and this does not reflect the 30th March. We did not pay the 30th March the purchase of the $49 million, and this happens. But then in April, that falls. And we are in a very strong position. We continue in a cash strong position. I would say that. And we're going to be careful the rest of the day playing and being defensive. Really taking care of that. The other thing that still happened someone said something about a couple of months ago. We continue working in these that we have volatility, and we're going to continue with that. We are convinced that we have to play a bit more being more defensive and we have to move that, we've been moving for a long time, the curve of the increasing the duration.
And if you see here on the left that increased [ $431 million ]. And these are by the credits that CMP uses. And these are credits that are more cheaper and like in a structured debt and it's like a short term. This is going to be cheaper. It is a structural cost that is cheaper than the pie because that's the reason why we use these measures. This is to play defensive on the structural cost of view, of course. This is the increase of the debt of 1,740, and this is approx specially done by the finance that we have for the CAP and also due to an increase of $65 million in pie that CMP. CMP and it's part of an increase of the debt. And during the year, that is going to increase in the second half that is different. So how are we doing is part of the debt of the EBITDA. And that increased a bit more and it's kind of accretively different because at the end of the year, most probably it should be returning.
All right. So our covenant here, more than covenant it's what we all try to take care of that is not go over 4x. We like the #2, but in this one that we have here. It's always going to be under that. So it's part of what do you want to make it. This is like it's part of the mining the net income, right? Is part of the shipment and also the production. This is explained by the Colorados and the price. And these has to -- this is something related with the market. And these cases increase and the cash codes increases with 2 things. There is another level of dilution and this is a great really important comparison is like 100 tons of production really and this is part of the budget. And this is related because we had to replace some ideas.
The mill #2 that seems to be ready at the end of the year and the ramp-up of that had the bumps and remained operationally in March. It is part of the production and for the 24% probably and is largely that it seems. And these 2 things, they were not part of the cash flow. How was that? The mix here? I would add two things. You can see the fall down of production and the deliveries, for the reasons I already explained, this is not a relevant thing. Pay attention that increased the pellets percentage that we are selling. We always said that the additional cost of turning that cost into pellets is not giving anything because we said, okay, that was paid. That was paid and then we send more pellet, but I don't know if that is going to continue the rest of the year.
But the business is profitable, that is gone, we can make it. But how much was that? I mean, if not, the business doesn't continue, we're going to continue with the previous percentage. Okay, then this is the one that is always interest. What happens with the cash codes. First thing on the graph here, you can see the quarter is compared with the first quarter of this year and the things increase. And a great part of this is related to the dilution of the fixed costs. We have also had a cost of energy and due to the contracts that we have. And in general, this is a fixed cost. If we compare the last quarter versus this one here, we are getting -- we are arriving at level of execution in spite of the lower level of dilution that we have, these are initiatives that have cost reduction, less movement and optimization of certain activities, and this is something that we are living experiencing and trying to control the costs.
Okay, let us move on. Are you all taking pictures? This is available in case you want it. So the Industrial business, here just see a bit what happens, the EBITDA increases and minus the fourth and minus plus 4 and the losses that they fall down, and that is very good. I don't like about the losses. So one needs to be positive and it's going to take some time. And in Cintac the volumes increased in 7% and in the rates is 74%. But it seems that last year it was a disaster. So in spite of that, that 74% levels of volumes are like under Northern level. The market has to be regulated and the margins improved and the expenses of administration and cost decreased and went up to $7 million, quite a relevant thing for Cintac. When they are in a turnaround, what happens? For the [indiscernible] take a look at this, they fell down 47%. The price was very expensive last year. The first time they came back with the flight 2024 with high prices. So the first term last year had special margins that were quite high.
And we're looking at some margins that probably they are more realistic to what we expect maybe have a power of improvement and maybe they're decreasing some areas. And here, we have the Brazilian competition and that really has the local level. Huachipato, finally Huachipato is starting the conversion, but showed some results that are positive not net results, but this is good news. This is something that we are posting and pushing today. We're pushing everything, but this is the one that financially is quite all right. So infrastructure, infrastructure of the business that we love and like, for example, this is a business that started a support for the mining business, and we have realized that there's a good opportunity.
We have some strategic assets, and we can take some value out of there. It's always a line of helping that concentration and that's part of a sustainable world, a more sustainable world. This is one of the reasons that we are getting in Aguas CAP, where we want to boost the power to third parties. And we have some strategies that we can't leverage and put as we name it. We have some costs that were environmental during the first term on the one time. And this is a matter of in which part of the year am I going to execute them. And the income that improved the onetime of P&L but that shouldn't be repeated after all. That's about financial results. I want to share now some additional things with you that I'm going to help you to understand where are we going?
Let's move to the strategy 2030 and the progress that we have had. This is just a reminder of something that you've seen. It's always important to remember, as a company, where are we going, where are we heading to remember that ourselves and operational companies and our ecosystem of suppliers and customers. CMP pushing towards the iron ore of high-quality, and it's essential for the transition of steel that is going to take a look at our transition and the margins of the high quality, they're going to increase over what we have today and [indiscernible] for low quality. And this happens if this goes in a much more clearer way as H&I E&I. And this clarifies we have seen these in the rare earths of everything that's going.
I'm going to give you a -- some piece of data, there are 2 markets, the Chinese one and the rest of the world. The problem is that in China, the price of the dysprosium that is one of the rare earths heavy ones change in Europe in spite of all these things, but this is very, very interesting. We're looking at it right now. I think that Cintac is focused and environmentally efficient of construction that are modularized. This is the reason why it is improved. These are the exceptional solutions, and I told you this one time they need sometimes need to work on snow conditions, extreme conditions, and we cannot have problems that needs an exceptional thing. And this is part of the hotel services.
It is distinguished from those things and is able to adapt that to the mining sector. This is really important and everything that is infrastructure supports that. And there also good news that give us flow stability. This is the reason why we like it so much. Other news what's going on with Los Colorados? There it is. What is happening with Los Colorados? Los Colorados, last time I told you that we have had these board of experts, radiologists that are specialists of the world, each of them is exceptional in their field. And they recommended that we made a sort of studies that give us information focus in different disciplines, either geological, geotechnical, et cetera. And that moves on, it has been moving on -- and in June, during the first week of June, we are going to review again the results that we have from those surveys, how to say it well, those taken -- the fact that we take those studies.
A possible recommendation. These are finished. We have not achieved anything. I mean we still need information and we have to take samples. But this is in order not to create force expectations. And in June, we're going to have something to tell you, but please think about the doctors -- general doctors, one asks for a broad sample, another x-ray, and another decision, I don't know, someone has to take a decision. Someone has to ask for a diagnosis. And this is where the expert board is going to be about. What about that? I mean, what are we doing? We're moving on the Stage 6. This is a stage that is out there and is part of the plan. It was always part of the plan the stage 6 that we were trying to do to accelerate that somehow and to cover the production that is for that to send the best body of the mine.
And the first time that was a bit complicated. The account that you take, for example, 800,000 tons less of production. And what we want to avoid is that it's not that we're for. What are we doing moving forward? So this is not like this is part of the plan. I told you the first half is going to be different. And the second half, we're going to recover production. We're going to have the update of the [ Brayton ] plant today doesn't have the possibility to take that decision. But the new permit is going to allow to increase the production and that should be released at the end of June. And then the second thing, we're going to optimize the grinding in [indiscernible], and this part is going to increase the flow production and we're going to increase the production of Los Colorados that will help you to have a higher flow and stability.
And finally, we will have the produce of minerals that is going to complement and support the potential of the deficit. So we have all of these things that come forward. This is part of [indiscernible] and we have the taking and we have the CNN. And we hope that almost the quarter may lead us to the fourth quarter, we have to wait for the diagnosis of that area. In June, we're going to be able to tell you something about it. Here this is -- Aclara is a business that we like a lot because we have the rare earths and we believe our potential. This is essential for the [indiscernible]. I'm not going to be able to have any [indiscernible] of generation, any [indiscernible] without any magneto. So it's something essential, it's like something very, very important.
And here what we're doing, we are getting the permit. We see the line of time, and that's part of the recovery of the observations of the different bodies where you can send your observations and we would like that through a sale. And still, the [indiscernible] #2 is not there. So the [indiscernible] #2. So we know about the main observations. This is something important. This is a good advance and we have some organizations that do agree, they don't have any observations, some of them were blessed what spending some observations of SAG. We don't see any that is specifically complex or difficult.
We have to continue as well with the participation, the citizen participation, and obviously, it has to continue with the indigenous consultation. So we're positive. We are positive because this is moving on quite all right, depending on the deadlines that it has to advance with. We are moving on. So I want to translate that good news. What other things.
Felipe Gazitua L.
Management
What else is relevant in Aclara, price or?
Unknown Executive
Price of the share.
Felipe Gazitua L.
Management
Stocks. China is not going to keep setting for clients or what China is not going -- doesn't want to share with the West world. This isn't being reflected in the prices by -- from different companies. So we can see here an increase on prices from its announcement of tariffs from the Liberation Day. What's the reason behind this is due to this. The price of this dysprosium in Europe. This is some news that was released a while ago.
But the -- it jumped from $850 per kilogram to $3,000 per kilogram. This is brutal. And it has not anything to do with China's prices. If you see Bloomberg and the prices of China for dysprosium are the same. The thing that's happening here is that we have a different market. Different market from the market in the West and this is quite positive for us. This is a project that is -- depicts our strategy and becomes quite important in terms of Chile and the world, and we hope to see it for us as well. Okay. Huachipato, we are working on the 4 lines of action that we mentioned last time.
The logistics hub, it's becoming a relevant actor and agent in the logistic and dock industry in the Southern cone and becoming territorially speaking, we also are interested in being relevant in the BOB region. We have the docks, and we also have the facilities for storage and logistics. We also have a connection with the train line. So we are -- we have everything needed to become a relevant actor in the national scenario. And in the industrial hub, we have been working also to develop the industries that maximize the value of our current assets. We have steel, for example, we had an agreement with Aclara to develop.
That's real alloys in order to work on past agreements with rare earths and steel with rare earth alloys. And we have also projects that are SMS, steel with SMS, which is a German specialist in this area that works on green steel. So we are still in an embryo stage at this point with this agreement. But we are quite certain this will become quite relevant in the future. And regarding the innovation hub, it's quite interesting because we have been working with authorities and universities in order to transform part of the -- our facilities in Huachipato in an innovation hub. And naturally, we want to be involved in this innovation that comes in line with our strategic objectives. And this is part of our strategy and innovation.
And lastly, our commitment with the region of Biobío is holding on. And we have been working with 450 hectares. And we are looking to have a strategy that is coherent with the idea of developing Biobío, and we have been working with a worldwide level -- world level, specialists in order to work with the government and the local authorities for these developments and with the academia as well. And this has been working quite fine up to this point. What have we managed to do in the last 2, 3 months is that we, in logistics, we secure agreements in limestone and coal -- my apologies on copper to maximize port facilities, and we have been offering integrated storage services and we have been looking to work with the territory in the area to make more agreements, and we are looking to increase both cargo volumes and increase the utilization of our existing infrastructure.
Regarding the industry area in Guarello, we have been transforming our model, we are looking to make Guarello more profitable with a lower volume after Huachipato appeared. And we saw a lower level of deals from Guarello and this has been working on so far. And regarding innovation, we have been working -- steel on industry, we have been working on our EE alloys and working on rare earth materials. And now on innovation, we have been working with entrepreneurs for the institutions and universities in order to design and to apply this self-sustaining innovation hub in what was before the Huachipato Casino. And this is going to feed and generate good initiatives for our business. And this is my -- and these are my last words is my wish is to wrap up here. And we have been working -- we need to keep working on our projects. And we need to tackle the contingency at Los Colorados and this can come from different paths.
We have -- we can recover Colorado, we can return partially. But we have to consider that the Los Colorados is in the final stage of its production. It had about 2 million tons there and but it doesn't go much further than 2 million tons be able to be recovered on 2028. So this is to say, this is hitting us currently, but the potential impact in the black swan event is quite limited. This is going to happen. And we are going to keep striving with the same energy and strength on different projects and different areas. And that's it.
Okay. So let's open the floor for the questions. And please, I'm very bad with names. So I want to learn all of your names. Please state your name at the beginning and the business where you we work for. And well, I know some of you, but I want to hear everyone's name before stating your questions. So please share the microphone in order to -- so people online can hear you.
Questions and answers
Unknown Analyst
Thank you, Felipe, for your presentation. I'm [indiscernible] BCI Investments. And I have 3 questions, 2 related with CMP. And well, regarding the [indiscernible], has an effect and has a lot of uncertainty. And this has to -- it makes difficult to commit to a particular schedule regarding Stage 6, I'm concerned on the additional capacity that is required and what's the schedule for the operation of Phase 6 and regarding the Elqui valley? I just wanted to know because we have the mail, I am aware of that, but that has been transferred to the second quarter or not?
And regarding the financial debt from EBITDA, well, you mentioned that this has increased from the first semester, and this should be reduced afterwards. That reduction at the end of the year, are we going to see them on 2025 or is it going to go towards the end of the year?
Felipe Gazitua L.
Management
Okay. Let's go fair point is Phase 6 was already considered. This was not a change in the plan because it haven't -- the contingency happened during Phase 5, we were working on in the Phase 6 already. But what's happening here is that we accelerated this process and we started working on Phase 6, but there are certain restrictions where we can't really work with the mineral because you need to move and to handle a lot of mineral waste beforehand. So I would say that the Phase 6 was always considered. The only difference here is that we want currently to reach on a quicker manner, to the more potent part of the mineral.
We have -- in terms of cash costs, we have to consider the grade of the ore, but this was part of the plan. So we don't have any news here. We have been working on this, and we need to make it quicker. That's it. So on the second question, well, the mills have a certain traps. We had this conditioning process, and we had to change certain spare parts and we worked it and we started working on March. So we have a ramp-up in order to reach its production level on sign. I don't know the details, but I wouldn't find it where do you see a degree of ramp-up that could help you, and this is operative from March and the impact, if you see it in this next quarter, we're going to see a difference here. We aren't changing mails constantly. We needed to do this. But this was due to certain failures that we saw and we needed to do this repairs.
And regarding EBITDA. Well we are aiming at reaching 3 towards the end of the year, but we might be over that. But we are preparing for that for the near future.
Unknown Analyst
Okay. Hi. Good morning [indiscernible]. Well, I have a question regarding Los Colorados. Is this contingency -- this contingency might risk, might put the interest post-operational process for 2033?
Felipe Gazitua L.
Management
No, I will state it clearly, it's not going to affect that the impact is going to be -- I insist on a short level. It's -- the impact it should be on 2025, 2026. We hope to return soon by the end of the year, but we don't have yet the results of the studies. And we need to see to have the Board of experts meeting, which are -- they are analogy of the doctors here, and we need to meet here.
Unknown Analyst
I'm Sandra from the investments. But I was thinking about cash costs because they were flat considering the last quarter, but with the public information available, you take this, the motivation of the volumes you see a cash cost from $165 per ton. So I wanted to better understand what's the difference between the calculation that you report with the public available information that you can use to do this calculation because it's a significant difference from 75 against 157.
Felipe Gazitua L.
Management
Well, that question I can't answer it off the cuff, but I can say that, but we have a very specific formula in mining, which has certain cost, but this is different from the balance results. So I would like to see your numbers [indiscernible], please send it to me.
Unknown Analyst
But can you calculate this with the public information available? Or is there data that is not accessible?
Felipe Gazitua L.
Management
Well, you typically need certain internal information. And that's the issue. I'll send it to you. So don't worry.
Unknown Analyst
Good morning, [indiscernible] from West Capital. I have a question related to Huachipato. Well, Mr. Felipe mentioned that next year, we should see certain costs -- fixed costs for next year because this is quite relevant because we need to consider the financial costs that can have an impact on the income. We need to make a decision where we maintain our intercompany expenditures and consolidated its deleted [indiscernible] Huachipato level?
Felipe Gazitua L.
Management
Yes, sure. I want to give you some info. Just we pay -- we pay a brutal amount of money for their legal costs for the space. We usually don't need 450 hectares for a port and a logistics hup. So this is quite relevant. So we need to have to do this perspective, we need to analyze the projects that are here and that can be done together with the community. We have an example here that has consistently brought up, which is the project of Biobío, where we have the -- we see a very connected company with cities.
This is an effort that you need to do as a country level. We need to fight for that. So considering this with fixed costs that are related to taxes and land taxes, we need to think that next year, we're going to reach our run rate of breakeven where we'll see in the third or fourth quarter, we might see that run rate of 0, and then we should be over 0, even considering this brutal cost on taxes that I mentioned so far.
Unknown Analyst
$15 million per [indiscernible] approximately?
Felipe Gazitua L.
Management
No, no, not $15 million. I would say. I said $10 million per year. Yes, yearly.
Unknown Analyst
Sorry, I'm talking about the year.
Felipe Gazitua L.
Management
Yes. It is not that big, yes. And regarding Huachipato, is there any dismantling that might -- we might see before the end of the year operationally speaking. No. No, we're not going to see that. We need to see a decision in the future regarding the load and the volumes regarding the modifying the depth of the docks because this is a good business because we have the contracts already. But operationally speaking, no, we shouldn't see anything of the sort.
Unknown Analyst
Can it be considered in CapEx?
Felipe Gazitua L.
Management
Probably in the future, yes. The dock, for example, this is a choice that we need to do in regard -- considering whether it's profitable or not, you tend to make the decisions consider profit first, not last.
Unknown Analyst
Well, if I have further questions regarding Los Colorados. I understood that on Phase 5, we have 2 million tons to be recovered. And in fact, Phase 6, this phase, necessarily will have a lower grade.
Felipe Gazitua L.
Management
Option B, yes. You start with [indiscernible] and you need to do [indiscernible] where you need to remove rock and take it to a land mine [indiscernible] and then you need to start. You have a great bench line where you need to analyze before working. So this takes some time. It's part of the mining plan in order to obtain the better grade and the better costs.
Unknown Analyst
So it's similar to Phase 5, right? How much time would you think this will take?
Felipe Gazitua L.
Management
I will need to see the documents. Phase 6 is quite long. I can ask how many -- what's the tonnage, but I can't remember at the moment. Phase 6, even has it shown subphases. Yes, I remember the map that had several tracks. So yes, it has different stages.
Unknown Analyst
And regarding Phase 5, what's the debt line? What's the end time for Phase 5? 2026 [indiscernible] 2027. So you are on Phase 6 and you should -- we would see this -- you see this compensation, right?
Felipe Gazitua L.
Management
Well, if we don't manage to reach Phase 5, we would see a neutral level in 2036. This will make production levels similar to those from this year if we see this scenario where we can't return, which is 15.6 million tons -- 15.5 million tons, 16 million tons. We usually don't measure looking at the lower figures, but we tend to benchmark towards that. And regarding the parties, should we see -- should we see the costs that are increased here. We tend to discuss the idea of having third parties.
Unknown Analyst
So -- the question here is how much do you buy the price and the cost of opportunity for your mineral. We have been gathering stock grade, which means it's less costly. It has lower costs. So this is less than ideal. So you need to complement here. Just to give a message here. And the other point that we might see change in the past is the mix of products that we might produce. And this is quite relevant here because if you have a lower grade in mineral, you can have a better ore and you can have pellet feed.
So you have this flexibility here where you can play on the on the production. This is quite useful. And lastly, on the CapEx that was defined for this year is the same, right?
Felipe Gazitua L.
Management
Yes, it doesn't change. 2 months has passed, I would be very ashamed of changing that.
Unknown Analyst
Okay. My name is [indiscernible] Compass. So I just wanted to -- I wanted to see the cash flows of the company. Regarding the changes this year, I wanted to see the CapEx and the changes of the CapEx here.
Felipe Gazitua L.
Management
Well, we have been taking care of everything we have -- we can [indiscernible]. We saw an increase in CMP on the first semester that we have a change of PPMs. So we have a curve where you see the changes in taxes and how are they paid. So we are taking care of everything related to inventory. We are paying a lot of attention for inventory and payable bills and regarding the care of capital materials, it will cause attention. We are doing all the efforts available to work on that. So we want to transform this highest -- the highest level of EBITDA possible. We have seen here this estimation that we saw in total CapEx for the year.
This hasn't changed so far despite the situation. And this having -- that has been related with the pre-streaming and have you had the idea of putting flowers in the mine. That's having a miner that goes to the best part of the material to do development there. That's very bad because in the following years, you won't be able to recover from that. So this is a mixture. So you need to keep working on that. We can't reduce it. It will be bad business in middle to long term. It shouldn't be here just on 2025, and we should be looking for 2030 and beyond.
I don't know what else to answer. So we are on top of this translation from EBITDA to generation of operational cash flows and working with cash flow staying here, not just going to CapEx.
Unknown Executive
This is part of the daily life Chilean [indiscernible] it would be like to flourish the mine. We don't have any chats on the chat so that's it. There's a question over here in the room, yes.
Unknown Analyst
[indiscernible]. Just resuming the subject of Los Colorados and the decrease that we have in the back to market, how do you project this adjustment to concerning the volatility of the prices and the rest of the years?
Felipe Gazitua L.
Management
Yes, in terms of budget, we do not project the back to market, it's impossible. It would be like having a crystal ball. And considering how we're going to move that every month and every moment those prices.
And then what do we expect for the prices for the rest of the year? I do not dare to say that you have to look at the market and the market would expect that they fall down. We had the consensus that would be 95 that we're still not moving them, and we are on the 110, and we expected much more volatility. I don't have any answers. We need to take a look at the market and take the consensus out. But we are not projecting the back to market, it would be like adding -- like talking about which market is going to win? It would be like saying that.
Unknown Executive
And there's a question. It is related to the back to market is going to be similar to what you say, but they are asking us if this delay, it will be concerning the back to market in the second quarter. It depends on the condition of closure of those contracts. Every contract, remember that it defines the conditions of the closure break. It would be for time, everyone is different. So I don't have the detail of their shipments. There's no impact considered, we don't see any clear impact going up or down. We are like considering that this is going to fall down, we have maintained the prices. We don't see that this is going to increase. We shouldn't have so much impact. So let's see. We now have to analyze that.
There are no more questions, Felipe, we are ready to close the session. Thank you.
Felipe Gazitua L.
Management
Thank you all very much. I would like to leave you 2 messages. Maybe the first one, we have a splendor future ahead us, but it has a bump, it has some bumps. To make a cake, we have to break some eggs and we are going to overcome this bump, it's a limited scope. It doesn't affect the limits. It doesn't affect the perspective of being a relevant actor for the automization. And let's hope you are all with us in this wonderful path that we're going to go through. Thank you very much for coming.