First Time Loading...

Applied Optoelectronics Inc
NASDAQ:AAOI

Watchlist Manager
Applied Optoelectronics Inc Logo
Applied Optoelectronics Inc
NASDAQ:AAOI
Watchlist
Price: 10.66 USD -1.75% Market Closed
Updated: Apr 26, 2024

Earnings Call Analysis

Q4-2023 Analysis
Applied Optoelectronics Inc

Company Signals Strong AI Demand, Microsoft Deals Mark Shift

The company's Q4 data center revenue comprised 56% from 100G products and 36% from 200G and 400G, reflecting a 31% drop and a 79% jump sequentially, indicating robust AI-driven demand. Notably, their collaboration with Microsoft to develop next-generation lasers and optical cables for data centers suggests a potential for revenue to surpass $300 million over several years. An initial shipment to Microsoft occurred in December, with future demand expected to increase in Q1 and beyond. Meanwhile, the telecom segment decreased by 56% year-over-year, attributed to lower 5G demand in China. The Q4 gross margin outperformed guidance at 36.4%, and the company remains dedicated to reaching around 40%. Operating expenses were steady at $21.6 million, with expectations of $22.5 to $24 million in the future quarters. They anticipate Q1 revenue between $41 and $46 million, and non-GAAP gross margins between 21% to 23%, with a potential net loss forecasted between $10.9 and $12.6 million.

Challenging Fourth Quarter Showing Resilience in Margins

Applied Optoelectronics reported fourth-quarter revenues of $60.5 million, missing the lower end of guidance by $2.5 million, largely due to a decrease in data center revenue. Despite revenues falling short, the company's gross margin reached 36.4%, the highest in five years, owing to a better product mix and engineering project contributions. This margin improvement, paired with disciplined expense management, enabled a modest non-GAAP income.

Data Center and 400G Product Lines: A Mixed Bag

Data center products saw annual doubling of revenue to $44.5 million, although down 9% sequentially, indicating strong year-on-year growth but some quarter-on-quarter weakness. Particularly impressive was the revenue increase for 400G products by more than eight times compared to the previous year, a clear growth signal in this product category.

CATV Segment and the Transition Ahead

The CATV segment experienced a sharp 67% year-over-year decrease in revenue to $12.6 million, tracing back to slower sales in the legacy equipment line as the industry gears up for the DOCSIS 4.0 transition. Nevertheless, a 22% sequential growth suggests some recovery or adjustment within this sector.

Prospects for Q1 and Beyond

The first quarter is projected to be softer, considering the Lunar New Year impact and scheduled price reductions. However, optimism stays intact for a robust Q2 and a notably improved second half of 2024 fueled by the traction with several new data center customers for both 400G and 800G products. These new engagements are expected to start significantly affecting revenue as early as the second quarter.

Long Range Optimism: Toward 1.6T and Profitability

While 2024 will not see substantial revenue from the 1.6 terabit products, there's a strong optimism surrounding their potential in 2025. The anticipated second-half improvement in 2024 sets the stage for what might be the first full year of non-GAAP profitability since 2018, a milestone for the company's financials.

Technical Leadership in Emerging Technologies

With the shipping of initial test samples of the 1.8 gigahertz amplifier products to major MSOs and the positive feedback received, Applied Optoelectronics expects to start revenue generation shortly after final qualifications in mid-2024. The company maintains a confident stance as a tech leader for the enhancements required for DOCSIS 4.0 network upgrades, picturing its products as essential in this upcoming shift.

Earnings Call Transcript

Earnings Call Transcript
2023-Q4

from 0
Operator

Good afternoon. I will be your conference operator. At this time, I would like to welcome everyone to Applied Optoelectronics Fourth Quarter and Full Year 2023 Earnings Conference Call. [Operator Instructions] Please note, this call is being recorded.

I would now like to turn the call over to Lindsay Savarese, Investor Relations for AOI. Ms. Savarese, please you may begin.

L
Lindsay Savarese
executive

Thank you. I'm Lindsay Savarese, Investor Relations for Applied Optoelectronics. I am pleased to welcome you to AOI's Fourth Quarter and Full Year 2023 Financial Results Conference Call. After the market closed today, AOI issued a press release announcing its fourth quarter and full year 2023 financial results and provided its outlook for the first quarter of 2024. The release is also available on the company's website at ao-inc.com. This call is being recorded and webcast live. A link to the recording can be found on the Investor Relations section of the AOI website and will be archived for 1 year.

Joining us on today's call is Dr. Thompson Lin, AOI's Founder, Chairman and CEO; and and Dr. Stefan Murray, AOI's Chief Financial Officer and Chief Strategy Officer. Thompson will give an overview of AOI's Q4 results, and Stefan will provide financial details and the outlook for the first quarter of 2024. A question-and-answer session will follow our prepared remarks.

Before we begin, I would like to remind you to review AOI's safe harbor statement. On today's call, management will make forward-looking statements. These forward-looking statements involve risks and uncertainties as well as assumptions and current expectations, which could cause the company's actual results, levels of activity, performance or achievements of the company or its industry to differ materially from those expressed or implied in such forward-looking statements. In some cases, you can identify forward-looking statements by terminology such as believe, forecast, anticipate, estimates, suggest, intends, predicts, expects, plans, may, should, could, would, will, potential or thinks or by the negative of those terms or other similar expressions that convey uncertainty or future events or outcomes.

The company has based these forward-looking statements on its current expectations, assumptions, estimates and projections. While the company believes these expectations, assumptions, estimates and projections are reasonable, such forward-looking statements are only predictions and involve known and unknown risks and uncertainties, many of which are beyond the company's control. Forward-looking statements also include statements regarding management beliefs and expectations related to the expansion of the reach of our products into new markets and customer responses to our innovations as well as statements regarding the company's outlook for the first quarter of 2024. Except as required by law, we assume no obligation to update forward-looking statements for any reason after the date of this earnings call to conform these statements to actual results, [indiscernible] changes in the company's expectations. More information about other risks that may impact the company's business are set forth in the Risk Factors section of the company's reports on file with the SEC, including the company's annual report on Form 10-K and the company's quarterly reports on Form 10-Q.

Also, all financial results and other financial measures discussed today are on a non-GAAP basis, unless specifically noted otherwise. Non-GAAP financial measures are not intended to be considered in isolation or as a substitute for results prepared in accordance with GAAP. A reconciliation between our GAAP and non-GAAP measures as well as a discussion of why we present non-GAAP financial measures are included in our earnings press release that is available on our website. I'd like to note the date of our first quarter 2024 earnings call is currently scheduled for May 9, 2024. Now, I would like to turn the call over to Dr. Thompson Lin, Applied Optoelectronics' Founder, Chairman and CEO. Thompson?

C
Chih-Hsiang Lin
executive

Thank you, Lindsay, and thank you for joining our call today. While our fourth quarter revenue came in below our expectations, our gross margin outperformed our projections, bidding to non-GAAP EPS at the high end of our expectations. We are pleased by the continued progress we have made in improving our gross margin, which combined with our expense management allow us to generate a small [indiscernible] income in the fourth quarter for the [indiscernible] time in many years. Further, we generated positive adjusted EBITDA of $4.8 million in Q4.

During the fourth quarter, we delivered revenue of $60.5 million, which was below our guidance range of $63 million to $67 million, primarily due to somewhat lower than expected data center revenue as we began to see some softness in demand led in the quarter. We delivered non-GAAP gross margin of 36.4%, which is highest quarterly gross margin that we have generated in the last 5 years and was above our guidance range of 34.5% to 36%, mainly driven by improved product mix and some contribution from nonrecurring engineering projects.

We generated a small non-GAAP net income of $0.04 per share, which was at the high end of our guidance range of a loss of $0.02 to earnings of $0.04. Total revenue for our data center products of $44.5 million, more than double year-over-year, but was down 9% sequentially. Revenue for our 100G products more than doubled year-over-year and revenue for our 400G products increased more than 8x in the same period. Total revenue in our CATV segment was $12.6 million, which was down 67% year-over-year and up 22% sequentially, largely driven by generally slow sales of [indiscernible] 3.1 equipment as the industry prepares for transition to [indiscernible] 4.0. With that, I will turn the call over to Stefan to review the details of our Q4 performance and outlook for Q1. Stefan?

S
Stefan Murry
executive

Thank you, Thompson. As Thompson mentioned, while our fourth quarter revenue came in below our expectations, our gross margin outperformed our projections, leading to a non-GAAP EPS at the high end of our expectations. We're pleased by the continued progress we have made on improving our gross margin, which combined with our expense management, allowed us to generate a small non-GAAP net income in the fourth quarter for the first time in many years.

Further, we generated positive adjusted EBITDA of $4.8 million in Q4. While we do see some softness in Q1 due to the combined effects of the Lunar New Year holiday in our Asian factories along with some price reductions, which are scheduled to take effect, we expect a strong recovery in Q2 and are currently anticipating a markedly improved second half of 2024. Despite the softness we are seeing in Q1, we have been experiencing significant traction with several new data center customers recently, for both 400G and 800G products, and we expect one or more of these customers to begin to contribute meaningfully to revenue starting in Q2, which gives us a basis for the optimistic outlook despite the slow start to the year.

While not likely to contribute meaningfully to revenue in 2024, we also are very optimistic about our 1.6 terabit products as we move into 2025. With the improvement we expect in the second half, we currently expect our first full year of non-GAAP profitability since 2018. Turning to the quarter. Our total revenue for the fourth quarter decreased by 2% year-over-year to $60.5 million, which was below our guidance range of $63 million to $67 million. As Thompson mentioned, this was largely due to somewhat lower-than-expected data center revenue as we began to see some softness in demand late in the quarter, which we attribute to timing of orders.

During the fourth quarter, 74% of our revenue was from our data center products, 21% was from our CATV products with the remaining 5% from FTTH, telecom and other. In line with our expectations, CATV revenue in the fourth quarter was $12.6 million. which was down 67% year-over-year and up 22% sequentially. We are encouraged by the sequential growth that we saw in our CATV business in Q4. Looking forward, we continue to expect that our near-term CATV business will be down compared to the historic highs we saw in 2021 and 2022 as the MSOs transition to next-generation architecture.

We anticipate this transition will begin to take place sometime in mid-2024 and are optimistic about the second half of the year. We shipped initial test samples of our 1.8 gigahertz amplifier products to 2 major MSOs in Q4. While these are early samples, the feedback we received on their performance and pricing is extremely encouraging. We currently anticipate shipping final qualification units of various amplifier products between April and June this year and expect revenue to begin shortly after the sample qualification is complete.

As we stated last quarter, we continue to carefully monitor MSO plans to upgrade to DOCSIS 4.0 networks, and we continue to believe AOI is a leader in technologies that will enable DOCSIS 4.0. Further, we are confident that our products are aptly designed for the deployment of amplifiers and other network elements required for DOCSIS 4.0.

Turning to our data center business. Our Q4 data center revenue came in at $44.5 million, which more than doubled year-over-year and was down 9% sequentially as noted above. In the fourth quarter, 56% of our data center revenue was from our 100G products, 36% was from our 200G and 400G products, and 4% was from our 40G transceiver products. As we had anticipated, revenue for our 100G products decreased 31% sequentially. Revenue for our 200G and 400G products increased 79% sequentially, which we believe is largely driven by AI demand for compute infrastructure.

As a reminder, as we have discussed on our prior few earnings calls, we signed 2 agreements with Microsoft in 2023, including a development program to make next-generation laser for its data center for 400G and beyond, and for the development of its 400G and next-generation active optical cables. While not guaranteed, we continue to believe that the revenue opportunity for our 400G and 800G products could be greater and a longer duration than the revenue contribution we saw from this customer during the peak of the 40G product cycle, which suggests that revenue from these products may exceed $300 million over the several years of these build-outs.

During Q3, and as we had discussed on our prior earnings call, -- we received request from Microsoft to expedite our production ramp for these products, which I'm pleased to report we were able to accommodate. We began shipments during December and expect to continue to ship in Q1 and although at a slower rate than we earlier expected, as the data centers work to install the optics we shipped in Q4. We expect demand to resume later in the quarter with additional capacity coming online then for Q2 and beyond.

Another item to note, we believe that the value proposition that we offer to Microsoft is just as strong with other data center operators, and we are working with several of them to evaluate our technology and qualify our products. This includes our 800G products. We shipped samples to 3 different data center customers in 2023 and have received initial positive feedback on our 800G products. We expect shipments of 800G to begin in Q3 this year.

Now turning to our Telecom segment. Revenue from our telecom products of $2.8 million was down 56% year-over-year and down 8% sequentially, largely driven by ongoing softness in 5G demand, particularly in China. Looking ahead, we expect telecom sales to fluctuate around current levels. For the fourth quarter, our top 10 customers represented 95% of revenue, up from 90% in Q4 of last year. We had 2 greater than 10% customers, 1 in the data center market and 1 in the CATV market, which contributed 51% and 28% of our total revenue, respectively.

In Q4, we generated non-GAAP gross margin of 36.4%, which was above our guidance range of 34.5% to 36%, and was up from 32.5% in Q3 of 2023 and up from 21.4% in Q4 of 2022. The increase in gross margin was driven mainly by our favorable product mix shift, our transition to a direct sales model in our CATV business and the impact of nonrecurring engineering sales during the quarter. We remain committed to the long-term goal of returning gross margin to around 40% and believe that this goal is achievable.

As a reminder, with the direct MSO sales model we implemented late last year, we expect margins in our CATV business to be meaningfully higher than our historical average. Total non-GAAP operating expenses in the fourth quarter were $21.6 million or 35.7% of revenue, which were in line with our expectations and compared to $21 million or 34.2% of revenue in Q4 of the prior year. Looking ahead, we expect non-GAAP operating expenses to range from $22.5 million to $24 million per quarter reflecting some acceleration of R&D expenses to improve time to market for our 800G and 1.6 terabit data center products.

Non-GAAP operating income in the fourth quarter was $0.4 million compared to an operating loss of $7.9 million in Q4 in the prior year. GAAP net loss for Q4 was $13.9 million or a loss of $0.38 per basic share compared with a GAAP net loss of $20.3 million or a loss of $0.71 per basic share in Q4 of 2022. On a non-GAAP basis, net income for Q4 was $1.6 million or $0.04 per share. which was above our guidance range of a loss of $0.9 million to a profit of $1.2 million and at the high end of our guidance range of a loss per share in the range of $0.02 to earnings of $0.04 per basic share. This compares to a net loss of $5.4 million or a loss of $0.19 per basic share in Q4 of the prior year.

The fully diluted shares outstanding used for computing the earnings per share in Q4 were $44.8 million. Turning now to the balance sheet. We ended the fourth quarter with $55.1 million in total cash, cash equivalents, short-term investments and restricted cash. This compares with $31.2 million at the end of the third quarter of this year. We ended the quarter with total debt, excluding convertible debt of $38.7 million compared to $46.6 million at the end of last quarter. Notably, during the fourth quarter, we successfully issued $80.2 million of convertible senior notes due 2026. The notes will bear an interest rate of 5.25% per year.

Concurrently with the offering, we exchanged or repurchased approximately all of our 2024 notes. As of December 31, we had $63.9 million in inventory compared to $67.5 million at the end of Q3. We made a total of $8.7 million in capital investments in the fourth quarter, which was mainly used for production and R&D equipment.

Moving now to our Q1 outlook. We expect Q1 revenue to be between $41 million and $46 million and non-GAAP gross margin to be in the range of 21% to 23%. Non-GAAP net loss is expected to be in the range of $10.9 million to $12.6 million and non-GAAP loss per share between $0.28 per basic share and $0.33 per basic share using a weighted average basic share count of approximately 38.4 million shares.

With that, I will turn it back over to the operator for the Q&A session. Operator?

Operator

[Operator Instructions] Our first question comes from Simon Leopold with Raymond James.

S
Simon Leopold
analyst

Great. A couple of things I wanted to unpack. One of which is you've given us, I think, some insight as to the total value of the opportunity from Microsoft and understand it's spread over years. Is there some sort of element you could offer to help folks understand or level set as to how that may ramp through 2024, how to size the expected contribution from the Microsoft project in this calendar year?

S
Stefan Murry
executive

Yes. I mean, we haven't really given out the details on that project. Obviously, a lot of it is customer sensitive, but at this point, I mean, it started to ramp. As I noted in our prepared remarks, I mean, we shipped product in December, which was ahead of schedule. The data center -- the individual data centers where those are getting installed or taken a little bit longer than expected to actually deploy those transceivers in the data center. So there's a bit of a lull right now while that goes on. And then we expect the ramp to resume later in this quarter and ramp throughout the year. We'll probably have more to say in terms of longer-term forecast after we start to see the results of this first tranche being adopted in the data centers.

S
Simon Leopold
analyst

Yes. I guess what I'm trying to get at is I have the impression that there are some folks that have envisioned this is sort of $100 million this year, $100 million next year and $100 million the year after that. And I think what you're describing is something that gradually ramps to that kind of run rate, but we're not getting to $100 million in 2024. I want to verify that my understanding is reasonable.

S
Stefan Murry
executive

Yes. No, that's accurate. What I have said is that it will be -- I think we said this on the last earnings call, is same thought process. Now that we think it will be ramping to exit the year on a run rate that would support that $100 million per year, but it's clearly not starting off the year. So we will not integrate out over 4 quarters of the year to be $100 million.

S
Simon Leopold
analyst

That's helpful. That's exactly what I.

S
Stefan Murry
executive

[indiscernible] yes, which would imply, of course, that in the out years, it will be more than $100 million per year in those other years.

S
Simon Leopold
analyst

Yes. No, that's what I was trying to pull out there. And then in terms of what's going on in the overall industry and applications, it seems as if a lot of the AI-related use cases are calling for 800-gig connections. And so I'm wondering, are you seeing your 400-gig products being used in back-end AI use cases? Or are there other applications? And if so, what are they?

S
Stefan Murry
executive

Yes, it's supporting AI and I'm not quite sure what you mean by back-end use cases, but supporting AI and the connections between the GPU cluster and the switch primarily. Now, I mean I think it's also likely being used in other non-AI applications as well. I mean there are other non-AI compute applications out there. It's not clear to me precisely the extent to which it's being used in AI versus non-AI applications that isn't really information that we're privy to. But certainly, AI is what Microsoft and others -- other large data center operators are primarily building the infrastructure around AI right now. So I would -- I think it would be reasonable to expect that the vast majority of it is being deployed in AI infrastructure.

S
Simon Leopold
analyst

Great. And then just to last maybe a little bit more color on how you see the cadence of your cable TV business in that this quarter was actually a bit better, a bit stronger than what we expected. But it seems as if you're suggesting or my interpretation of your suggestion is sort of a step function in the second half of the year. Anything you could do to give us some sort of bounds on what that implies?

S
Stefan Murry
executive

Yes. I mean I think you're more or less correct in what you're saying in terms of the step function in the middle of the year. What's going on right now is that we're continuing to sell DOCSIS 3.1 products, which are on their way, they're not obsolete yet. It's what's currently deployed in the networks. But those products that are being shipped now are being used in new builds, not upgrades, but just new areas that need to be built out or repairs, things like that, it's kind of a steady state business.

What we expect to happen in the middle part of the year is that we'll layer on the new 1.8 gigahertz products, which are going to be used in new network upgrades, which is really where the excitement is, frankly, and that's why we tried to call out some specific dates in our prepared remarks earlier that we expect to have those amplifiers in for qualification between April and June. There are several different models there, so they'll ship at various times within that time frame. And then we do expect revenue to begin pretty quickly thereafter because I think the -- there are several MSOs that are really appear to be very interested in starting those upgrades quickly as soon as the products become available.

Operator

The next question comes from Michael Genevieve with Rosenblatt Securities.

U
Unknown Analyst

So it sounds like, I mean, the narrative over the last quarter or so has been that the -- that your big customer here asked you to hurry up and expedite the development of the product, and it seems like you executed extremely well to do that. And then -- so it's sort of like a hurry up and now wait situation. So could you provide -- I mean, is that [indiscernible].

S
Stefan Murry
executive

Yes. Sorry, didn't mean to interrupt there -- that was the end of the question, go ahead. .

U
Unknown Analyst

No. Yes. So I mean, I guess, I was just going to also ask some more color on that. But also like -- if that is in fact the case, I mean I hear you're reiterating the $300 million number. That hasn't changed. But what else can give us confidence that this is just a timing delay and not any other kind of fundamental change here?

S
Stefan Murry
executive

Sure. So first of all, I guess, some commentary on the slower start to the year that we're seeing, specifically with the data center deployment that I mentioned earlier. So these things are difficult to predict. What happens is that the product is qualified and put into use. Data centers order an initial quantity of it to begin putting product in there and then they start to deploy. And I'm sure you can probably understand just based on prudence, that they don't always deploy the new technology as fast as they will when sets it at scale, right? They want to take it slow and make sure there's no issues. And I believe that's probably the most likely explanation for what's going on. . And then once that initial phase of deployments proof that it's going well, then they'll order larger quantities to continue the deployment. As far as what we expect to see throughout the rest of the year. I mean, at the same time, by the way, we're still continuing to build manufacturing capability and capacity for the ramp that we see through the rest of the year. So as far as what can give you the confidence there. I think probably the only thing that I could really point to is the fact that we continue to invest pretty heavily in CapEx. If you look at our CapEx in the fourth quarter, it's ramped significantly from what it was earlier in the year. Clearly, not all of that investment came online and produced products in Q1. And so I think That, along with our commentary about a markedly improved Q2 would hopefully give you guys some level of confidence that this is a temporary condition.

C
Chih-Hsiang Lin
executive

And don't forget, we -- we have said we had [indiscernible] the sample to 3 new [indiscernible] customer in the U.S., and we believe the volume will start to [indiscernible] by, I would say, end of Q2 or early Q3, something I think would be the Q2, the [indiscernible] based on. .

U
Unknown Analyst

Yes, I'd like to follow up on that point because I mean we hear you saying delivering sample, but then also expectation of revenue in 2Q accelerating into Q3. So kind of the missing step between those 2 is qualification customer win. But given your confidence in Q3, it sounds like you already must already be past that. Is that -- you must have already passed that milestone. Is that a correct understanding?

S
Stefan Murry
executive

Well, certainly for the opportunity that we were talking about earlier that we've been referring to on most of the questions, obviously, that is past the qualification standpoint -- qualification point at this juncture. Other opportunities, I mean we have various opportunities that are either pass qualification or in-qualification we expect to finish up in time to be able to deliver revenue in Q2.

U
Unknown Analyst

Okay. Great. And then just final for me just to sort of help understand the business mix a little bit better. Could you give us a sense of data center right now the revenue mix roughly between transceivers and lasers? And then if we look ahead to, say, the fourth quarter of this year, first quarter of next year, is that going to remain constant? Or will we see some kind of change in that mix?

S
Stefan Murry
executive

So right now, the revenue mix in the data centers almost entirely transceivers are active optical cables probably 95% of it is transceivers and optical cables. I don't expect that to change too much. In fact, it will probably get closer to 100% because the new opportunities that we're talking about are all for either transceivers or active optical cables. So I think the thing that might be giving you a little bit of that might be behind that question, if I can kind of read into it is this question of, well, we had 2 different projects with Microsoft, 1 for lasers and 1 for active optical cables, right? And that is true. But what I think you may be not completely understanding is that most of the lasers, in fact, right now, all of the lasers are used in our own active optical cables. So the revenue -- while we are making lasers and working on making lasers, the revenue will be for the active optical cables that ultimately utilize those lasers.

U
Unknown Analyst

Yes. That actually was my understanding, but I do get a lot of questions on that, and I wanted to make sure that I understood it correctly. So thanks so much for the answers. I'm glad to be on the conference call now and to be getting in here on a good time. Thank you.

S
Stefan Murry
executive

We're excited to have you, thanks.

Operator

The next question comes from Tim Savageaux with Northland Capital Markets.

T
Timothy Savageaux
analyst

A couple of questions. First on, I guess, some elements of guidance that you provided for the year. So I think you were talking or expecting to be profitable on a non-GAAP basis. I don't know if that's net income or operating profit or both. But I just want to confirm that for the year. .

S
Stefan Murry
executive

Yes, that would be net income. Non-GAAP net income profitable for the year, yes.

T
Timothy Savageaux
analyst

Okay. Well, and I guess you've given us a range for OpEx. So I know you're starting the year pretty low from a gross margin perspective. But saying if you're able to get that stay up to 30% for the year, which may or may not be reasonable, I mean that -- we can take a revenue range out of that that's solidly over $300 million. I mean, obviously, weighted toward the back half of the year. But am I doing that math right?

S
Stefan Murry
executive

Yes.

T
Timothy Savageaux
analyst

Excellent. Okay. And then I want to follow up on some details on the 400-gig category. You saw that increase about $10 million in the quarter with pretty healthy declines on the 100-gig side. I assume that's where the weakness is from a demand standpoint. But I mean, is it fair to attribute most or all of that increase to the active optical cable shipments and to the extent you expect it to turn back on, let's say, in Q2, is that the type of order of magnitude we should be expecting as you move your way towards exiting the year, say, $25 million a quarter run rate.

S
Stefan Murry
executive

So let's see a couple of questions embedded in there. The first one was is was the active optical cables responsible for most of the increase in 400G revenue? The answer to that is yes. The second part of that question was I wasn't quite clear exactly how you're asking that is I said earlier that we would expect that to be kind of on a run rate of $100 million a year or $25 million a quarter by the end of the year. Are you just trying to confirm that? Or was there another question that I kind of.

T
Timothy Savageaux
analyst

No. Another little question there and that is, -- to the extent you're expecting a bounce back or improved Q2, which you referenced in the release, should we say -- think that most or all of that improvement is returning to that Q4 level or above from an AOC perspective.

S
Stefan Murry
executive

I'd have to -- it's probably close to it. I'd have to kind of do the math to answer that question precisely. We do expect some other new 400-gig business to start ramping in Q2 as well. So I'm a little I'm a little hesitant to say that's absolutely the dominant factor, but most likely, it would be close to that, yes.

T
Timothy Savageaux
analyst

Okay. Great. And then last one for me, I think, at least, and you stepped through this before, but I want to make sure I understand. Last quarter, you talked about sampling 800-gig products to 4 customers, including 3 hyperscalers. I think I got that right. Is what you're saying when you expect 800 gig to be able to start to contribute midyear, end of Q2 into Q3, is that one of those that you have sampled has turned into production customer? And is there any update to the kind of customer engagement metrics sampling whatnot on either 400 or 800G in Q4 or Q4 and year-to-date '24?

S
Stefan Murry
executive

Sure. So I mean, to be clear, we have not completed final qualification on any of those 800G products at this point. So we did have 3 customers that we sampled last year at the end of the year. And in addition to that, just within the last, I don't know, a month or so, we've had some significant new interest from other new customers besides the 3 that we shipped to last year. So without trying to tip our hat too much here. I think it's likely that 1 or more of either the customers we shipped to last year or 1 of these newer customers will be a customer generating revenue for us in the Q3 time frame for 800G.

As far as the kind of the demand, I guess, you could say, kind of the feeling that we have around demand. I would say that the need for 800 gig right now, it seems to be particularly acute. I think there's a lot of demand for that. And that typically means that qualification and revenue generation can go rather quickly. It's when -- It's when demand may be somewhat low that you start to see the qualification cycle stretch out and things like that, and we're definitely not in that situation in my estimation for 800G at this point.

T
Timothy Savageaux
analyst

Well, got it. Let me sneak one more in here. Sorry about that. But along those lines, I guess, you spent a fair bit of time over the last couple of 3 quarters sizing the active optical cable opportunity at Microsoft. But as you look at your 800-gig pipeline and some of the customer engagements you have, I guess, how would you size that opportunity relative to what we've been talking about with Microsoft at 400 gig.

S
Stefan Murry
executive

I mean the opportunity there is several times larger, many times larger. It remains to be seen how much of that market we can get. I don't want to create too much irrational exuberance at this point. But the market size, the market opportunity there is huge. And it's being driven by AI. I mean there's nothing that should be mysterious about the demand profile, right? I mean we heard NVIDIA talking today under -- or yesterday on their earnings call about the amount of compute infrastructure that's being built, all of that needs to be interconnected. And a lot of it is being interconnected at 800G and frankly, we'll be probably moving to 1.6 terabits in some applications early next year. So the opportunity is huge. I think we're well positioned for that.

Like I mentioned earlier, we've seen a lot of new customer inbound interests just recently. And there's a lot of work to be done, and I'm not predicting we're going to get what percentage of that market will ultimately be able to get. It's a little early to say, but the market opportunity there is huge.

Operator

Our next question comes from Dave Kang with B. Riley Securities.

U
Unknown Analyst

My first question is regarding your first quarter outlook. Can you just provide more color in terms of each product segments how they're going to decline sequentially .

S
Stefan Murry
executive

Well, we don't really give guidance by product segment. But clearly, the the cable TV business, no matter kind of what happens there. It's not big enough. In it's not going to collapse to 0. So whatever happens there is not likely to account for the majority of the decline. So that's going to come primarily from the data center business. We noted in our prepared remarks earlier that it's a combination of factors there that the lunar year, a lot of these products are made in our China facility. And so the mix of those products shifted a little bit unexpectedly on us towards the end of last year, which resulted in having to make new products essentially that we hadn't necessarily planned for in advance, and that's why the Lunar New Year caught us a little bit unprepared this year.

In addition to that, we did have some pricing reductions. And again, most of that, you can assume is in the data center side that kicked in towards the end of last year. And both of those 2 factors account for the bulk of the decline.

U
Unknown Analyst

So on the second part about pricing reductions, was it mainly 100 gig or it involved 400-gig as well?

S
Stefan Murry
executive

No, it was mainly on the gig. I don't believe we had any price reductions on 400 gig in quarter.

U
Unknown Analyst

Got it. And then when you talk about second quarter snapback, are you just talked about 400 gig? Or will 100-gig recover as well?

S
Stefan Murry
executive

We expect it will be mostly 400 gig. There may be some recovery in 100 gig is a little bit unclear, but that technology is clearly in the waning phase of its life cycle. 400 gig is clearly going to be picking up more in the near future. And again, as we talked about earlier, later in the year, 800 gig, we expect to contribute as well.

U
Unknown Analyst

Right. And then on the Microsoft, do you have any kind of like backlog to speak of that gives us confidence that you'll that they'll ramp throughout this year? Or is it still based on their forecast?

S
Stefan Murry
executive

I mean we have a small backlog what we always do, but it's consistent with what we've seen over the years. It's nothing that would guarantee a ramp throughout the year, no.

U
Unknown Analyst

Got it. And my last question is, you talked about Microsoft to add another supplier. What's the latest on that?

S
Stefan Murry
executive

I'm sorry, I didn't quite understand your question. You said Microsoft adding another supplier for the [indiscernible].

U
Unknown Analyst

Yes, AOC possibly adding another supplier in addition to you. Any latest update on that?

S
Stefan Murry
executive

Right. Yes. I get your question now. So I mean I'm not aware that there's any other supplier that's shipping at this point, but I really wouldn't really be able to share that information even if I were. But as a matter of fact, at this point, I'm not aware of it. So.

Operator

This concludes our question-and-answer session. I would like to turn the conference back over to Thompson Lin for any closing remarks.

C
Chih-Hsiang Lin
executive

Okay. Thank you for joining our call today. As always, we want to extend a thank you to our investors, customers and employees for your continued support. We look forward to see many of you at [indiscernible] and to updating you on our next earnings call.

Operator

The conference has now concluded. Thank you for attending today's presentation. You may now disconnect.

All Transcripts