Industrial-gas margins fund a business with lumpy, project-led capital needs

As the business has scaled, underlying operating margins have moved into the low-to-mid-20% range and supported substantial operating cash generation. Large project outlays have repeatedly made free cash flow far less stable than operating income.

What changed

Fiscal 2026 operating cash generation strengthened while lower spending moved annual free cash flow back above zero after consecutive deficits. That is a cash-flow inflection, but its durability depends on whether operating cash continues to cover project spending after the portfolio reset.

What matters next

Whether operating cash flow continues to cover capital expenditures as the lower spending pace persists.

USD
Metric FY2017 FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026
3.3B 2.8B 2.2B 5.3B 4.5B 2.7B 1.6B 3B 1.9B 1.3B
3.3B 2.8B 2.2B 5.3B 4.5B 2.7B 1.6B 3B 1.9B 1.3B
404m 184.7m 166m 1.1B 1.3B 590.7m 332.2m 5m 0 —
1.5B 1.4B 1.4B 1.4B 1.8B 2B 2.3B 2.3B 2.4B 1.8B
1.2B 1.2B 1.3B 1.3B 1.7B 1.9B 1.9B 2B 2.1B 1.8B
281.3m 170m 90.9m 86.7m 84.4m 77.8m 337.6m 270.4m 292.8m 0
420.2m 473.6m 388.3m 404.8m 453.9m 514.2m 651.8m 766m 776.5m 741.2m
323.6m 255.4m 399.9m 504.8m 341m 441.7m 347.8m 340.4m 761.3m 1.1B
5.9B 5.1B 4.6B 8.7B 8.4B 6.3B 5.2B 6.4B 5.8B 5B
8.4B 9.9B 10.3B 12.3B 13.8B 14.9B 18.4B 24.4B 26.3B 26B
8.4B 9.9B 10.3B 12.3B 13.8B 14.9B 18.4B 24.4B 26.3B 26B
(11.1B) (11.6B) (12B) (13.2B) (14.2B) (14B) (15.3B) (16.6B) (17.4B) (18.3B)
368.3m 438.5m 419.5m 435.8m 420.7m 347.5m 334.6m 311.6m 293.5m 262.7m
721.5m 788.9m 797.1m 891.5m 911.5m 823m 861.7m 905.1m 963.9m 948.6m
1.2B 1.1B 1B 816.3m 740.3m 583.1m 1.3B 1.6B 1.4B 1.4B
1.3B 1.3B 1.3B 1.4B 1.7B 3.4B 4.7B 4.9B 5.4B 5.7B
559.7m 562.1m 486.1m 566.3m 873.4m 880.4m 1.2B 1.1B 921.6m 1.8B
721.5m 788.9m 797.1m 891.5m 911.5m 823m 861.7m 905.1m 963.9m 948.6m
18.5B 19.2B 18.9B 25.2B 26.9B 27.2B 32B 39.6B 41.1B 41.2B
659.5m 924.6m 528.2m 546.2m 736.8m 1.1B 1.2B 1.5B 1.4B 3.6B
251.9m 285m 212.1m 285.4m 325.4m 350.2m 495.1m 489.4m 549.7m —
144m 54.3m 58.2m 7.7m 2.4m 10.7m 259.5m 83.5m 34.7m 77m
416.4m 406.6m 40.4m 470m 484.5m 548.3m 615m 611.4m 716.3m 921.7m
1B 667.8m 982m 1.1B 1.3B 1.4B 1.3B 1.5B 1.5B 139.3m
438.9m 156.6m 247.4m 313.8m 366.8m 439.1m 413m 240m 253.4m —
2.5B 2.3B 1.8B 2.4B 2.8B 3.5B 3.9B 4.2B 4.2B 4.7B
3.4B 3.4B 3.2B 7.4B 7.2B 7.1B 9.4B 13.5B 16.9B 16.8B
778.4m 959.5m 1B 1.2B 1.3B 1.4B 1.4B 1.2B 579.6m 673.6m
99.3m 318.8m 334.7m 363.3m 548.3m 558.4m 1.3B 1.6B 2.3B 2.9B
1.6B 1.4B 1.5B 1.7B 1.5B 1.6B 1.6B 2B 2B 1.9B
8.4B 8.3B 7.9B 13.1B 13.3B 14B 17.7B 22.5B 26B 26.9B
249.4m 249.4m 249.4m 249.4m 249.4m 249.4m 249.4m 249.4m 249.4m —
12.8B 13.4B 14.1B 14.9B 15.7B 16.5B 17.3B 19.5B 17.6B —
1B 1B 1.1B 1.1B 1.1B 1.1B 1.2B 1.3B 1.3B —
(2.2B) (2.1B) (2B) (2B) (2B) (2B) (2B) (2B) (2B) —
(1.8B) (1.7B) (2.4B) (2.1B) (1.5B) (2.8B) (2.4B) (2B) (2.1B) 14.3B
10.1B 10.9B 11.1B 12.1B 13.5B 13.1B 14.3B 17B 15B 14.3B
18.5B 19.2B 18.9B 25.2B 26.9B 27.2B 32B 39.6B 41.1B 41.2B
218.3m 219.5m 220.4m 221m 221.4m 221.8m 222.2m 222.4m 222.6m 222.7m