Earnings Call Analysis

Q3-2024 Analysis
Ge Power India Ltd

GE Power India Q3: Orders Up, Revenue and Loss Down

In the third quarter, GE Power India saw a 28% year-over-year increase in orders to INR 195 crores but faced a decline in revenue from INR 533 crores to INR 456 crores. Additionally, loss before tax decreased significantly from INR 30 crores to INR 2 crores, partly due to one-time gains like forex and tax refund interests. The company's backlog dropped from INR 3,699 crores to INR 3,437 crores. The focus going forward is on claim settlements, cash collections, and improving order intake, particularly for Flue Gas Desulphurization (FGD) projects.

Navigating a Slowing Economy with Optimism for Future Power Demand

In assessing the third quarter and nine-month performance ending in 2024 for GE Power India Limited, we began by considering the broader economic background. The global power demand grew by only 2% in 2023, subdued due to various challenges including the aftermath of the energy crisis and economic downturn in developed economies. In contrast, emerging markets like China, India, and the Middle East showed robust growth, with India's power demand soaring by 9.5% in FY '23. Looking ahead, global electricity demand is projected to accelerate, averaging a 3.4% growth annually through 2026, with India's demand expected to rise by 6.5% from '24 to '26, positioning India as a significant player in the sector.

Company's Financial Health amidst Project Delays and Lower Order Intakes

GE Power India's revenue declined by 14% in comparison to the previous year, sitting at INR 456 crores for Q3 '24, impacted by fewer orders and project delays. The order backlog dropped from INR 3,699 crores to INR 3,437 crores over the quarter. Despite this, the service business saw a substantial increase, with 56% more orders compared to the previous quarter. One highlight is the reported loss before tax decreased significantly to INR 2 crores in Q3 '24 compared to INR 30 crores in Q3 '23, benefiting from one-time impacts such as foreign exchange gains and refunds on interest income.

Analyzing the Slowdown in the Flue-Gas Desulfurization (FGD) and Hydro Sectors

A keen point of interest was the cause of slower conversion of opportunities into orders within the critical FGD and Hydro sectors, crucial for regulatory compliance and long-term contracts. The company's management noted the government’s extension of the compliance deadline as a factor, leading to slower order placement by customers. Despite being the lowest bidder on the Gujarat Sikka project nearly a year ago, it took nine months to officially secure the order, illustrating the delay in converting bids into revenue. Consequently, this lag affects the company's run rate and backlog necessary for revenue generation.

Outlook and Focused Strategies for Operational Improvement

To address the immediate challenges, GE Power India is focusing on claim settlement and improving order intake. They are emphasizing operational refinement, aiming to optimize resources for improved competitive standing. Interestingly, the management refrained from providing forward guidance on operational positivity, suggesting investors monitor order intake and backlog closely for indications of an upswing. The company also aims to diversify its risk by focusing on non-EPC business, services, and private and government customers to enhance margin profile and cash flow.

The Service Segment's Increasing Influence on Revenue

In an interesting shift, services contributed 92% of the quarter's orders, due to a lack of new FGD or Hydro projects. This indicates a strengthening service segment for the company. However, the executive clarified that the change was quarter-specific and not reflective of the entire backlog, which includes different business areas.

Earnings Call Transcript

Earnings Call Transcript
2024-Q3

from 0
Operator

Ladies and gentlemen, good day, and welcome to the earnings conference call of GE Power India Limited in respect of its financial results for the quarter ended on 31st December 2023. [Operator Instructions]

Please note that this conference is being recorded. I now hand the conference over to Mr. Prashant Jain, Managing Director, GE Power India Limited. Thank you, and over to you, sir.

P
Prashant Jain
executive

Thank you, [indiscernible] and very good evening to you all, and thank you for joining the discussion on our financial and operational performance for the third quarter and 9 months ended financial year 2024.

For this call, I welcome my team, who has joined me to answer your queries. I have with me, Mr. Yogesh Gupta, the CFO; Mr. Roshan Singh, Head Sales of FGDs and Emissions; Mr. Raj Raman, Executive with Projects; and Mr. Kalpesh, the Hydro Business Country Finance Officer.

I would start with the global economy. Looking back at 2023 the global power demand growth saw a notable deceleration standing at 2%. This slow down was influenced by various factors, including the aftermath of the energy crisis, which cast a shadow on economic growth in developed economies.

However, according to the McKinsey's recent article on Power Outlook, trajectory of global power demand is set to surge across sectors in the coming years. Our notable surge is expected in transport sector driven by rapid growth in the electrical passenger's vehicle.

Within the industry, a doubling of power demand by 2050 is foreseen, fueled by the electrification of low-to-medium heat processors and escalating needs of data centers. Simultaneously, the power demand building is also projected to double, simulated by growing demand in emerging markets and electrification administrative's gaining traction in OECD countries.

Considering various scenarios, power demand is forecasted to grow globally, influenced by factors like population growth, increasing wealth per capita, continued trend of electrification.

While China, India and North America are expected to contribute more than half of the global power demand growth, economies in regions such as Africa, Middle East are anticipated to experience fastest electrical growth aligning with good growing wealth per capita.

In 2023, robust growth in electricity demand was observed in China, India, and Middle East countries and Southeast Asia, whereas advanced economies posted substantial declines. This decline was attributed to lackluster macroeconomic environment, high inflation leading to reduced manufacturing and industrial output.

Looking forward, the trajectory is optimistic with global electricity demand projected to grow at a faster rate, averaging 3.4% annually through 2026.

Coming to Indian economy and Power sector. In the Indian context, the power demand has been robust since last 2 years. In FY '23, the power demand grew 9.5% and in the 9 months period of current financial year, power demand is around 8%, reaching 1,221 billion units. In September this fiscal year, peak power demand touched a record high of 243-odd gigawatts, far higher than 220 gigawatts witnessed in 2023. Continued rapid economic expansion and robust demand for space cooling their main pillars of growth in the electricity demand.

After 2 consecutive years of strong gains, India's electricity consumption surpassed that of Japan and Korea combined at the end 2023, bolstered by a fast-growing economy and powered by increased electrification. India's electricity demand is expected to rise by an average of 6.5% over '24 to '26 period. India pose this fastest growth rate through 2026 among major economies. Over the next 3 years, India will add electricity demand roughly equivalent to the current consumption of United Kingdom. 1/3 of this incremental electricity demand is expected to come from rising coal-fire generation.

Additionally, the government's approval for coal and lignite-gasification projects has further boosted sentiment in the Power sector. This move is seen as a significant step in reducing chemical import [ system ] to domestic power industry.

Despite these developments, a challenge in India's Power sector lies in the reliance on coal and lignite-fired power plants. Currently out of the total capacity of 207 gigawatts, only 22 units with a capacity of about 9.38 gigawatts less than 5% have been fitted with flue-gas desulfurization or FGD systems. This indicates the need of implementation of FGDs in the Power sector to resume sulfur emissions and enhance efficiency of the units. Your company is a prominent player in this technology, and we are hopeful government accelerating compliance of installation of FGDs over the next couple of years.

Moving on to the executive summary of the performance of your company for the third quarter and 9 months ending for GE Power India Limited. In the third quarter of the financial year '23, '24, we continue to see that FGD and Hydro PSP opportunities are converting to orders slower than anticipated. Our revenue is down 14% versus the second quarter of previous year, mainly due to lower orders in previous quarters as well as project delays. Claims settlement continues to be slow. However, we continue our efforts towards them.

The service business continues to grow with 56% more orders quarter-on-quarter. Operational pressures and executing challenges on our new build project sites still persist.

Multiple onetime impacts have a positive influence on profit this quarter, including ForEx gain and interest on income tax refund. That's the overall summary of the operational performance of the company in the quarter ending December '24 (sic) [ December '23 ]. I now hand over the call to Yogesh, who will take you -- '23, sorry.

I hand over the call to Yogesh, who will take you through financial performance of the company for the quarter. Over to you, Yogesh.

Y
Yogesh Gupta
executive

Thank you, Prashant. Good evening, everyone. I'm pleased to welcome you all to share the financial and operational performance for the third quarter of FY '23, '24.

During the quarter, the company booked orders worth INR 195 crores against INR 152 crores in Q3 FY '22, '23, which is 28% higher in this quarter. The slower-than-anticipated order inflow from FGD and Hydro, the Pump Storage has impacted revenue. The backlog that has depleted from INR 3,699 crores as of September '23 to INR 3,437 crores as of December '23. Lower-than-expected orders in the last 2 years and the Saundatti Project suspension has resulted into lower revenue for the quarter.

Revenue for Q3 '24 stood at INR 456 crores down from INR 533 crores in the corresponding quarter of the last year. And the revenue in Q3 '24 is higher than the revenue of INR 354 crores in Q2 '24.

Cost escalation due to project delays, execution challenges at site and slower claim conversion has led to lower margins for the quarter. As we navigate through the evolving customer expectations, amidst the changing market dynamics, the complexity of our operational landscape, poses ongoing hurdles. The persistent operational challenges demand attention and strategic resolution. And hence, with an aim to mitigate these pressures, we are refining our operational framework and that keeps us in progress optimization and resource reallocation to ensure sustained competitiveness and long-term [ validity ]. Loss before tax for Q3 '24 was INR 2 crores against loss before tax for Q3 '23 of INR 30 crores. The reduced loss is due to onetime impact in the current quarter, which are for ForEx gain, interest on income tax refund, onetime cost impact of Durgapur restructuring in Q3 '23.

Further, the decrease in loss for Q3 '24 as compared to loss before tax for Q2 '24 of INR 62 crores is due to onetime impact stated above, ForEx gain, interest on income tax refund and increase in margin on certain projects.

Summarizing -- focus areas for the company continues to be claim settlement and cash collection by executing the -- on FGD projects, the improvement in order intake is an important milestone to watch out for.

We are now -- open the floor for Q&A.

Operator

[Operator Instructions] The first question is from the line of Akshay from JHP.

U
Unknown Analyst

So what was the reason for slowdown in the -- on the FGD and Hydro side?

P
Prashant Jain
executive

Thank you. It is not a slowdown. The -- as I've mentioned earlier, that less than 5% have been commissioned FGDs and the units. The government has extended the timeline for implementation of FGDs by about 2 years. So the customers have come with a sense. So if you look at the central sector, LTTC, has ordered all the FGD units, majority of their installations. The State and the private customers, they are now following through. So we have seen one order and then we have seen -- so the orders have not materialized to the extent that we were expecting to materialize. That's where we are.

And Hydro, of course, it's always been a long-cycle business. And therefore, it's always taken time to convert an opportunity to an order. So -- and the order that we converted previously, Saundatti, it's almost a year now. It has been under suspension, that's a PSP Hydro, that's because of certain land clearance issues. So that -- even though we booked the order, the conversion to revenue is taking a lot longer than anticipated. So that's the headwind that we see in the [ topline ] of the company.

U
Unknown Analyst

Okay. So but if I compare some of your competitors for example, Power Mech, has been able to get a lot of FGD orders as well. So what is the reason behind they getting and we not getting?

P
Prashant Jain
executive

We've also announced an order, if you remember, in Gujarat. The question is, what was the expected demand versus what is the actual conversion of orders with the demand. So if you look at the entire statistics of the total demand, I will call upon to Roshan to throw some light in terms of the ordering happening and the conversion with the FGD. Roshan?

R
Roshan Singh
executive

Yes. Thanks, Prashant, and hello, everyone. Roshan with Sales. So when coming to the conversion, like vis-a-vis when compared to last -- this 9 months, there was 20 gigawatt what was overall ordered in the market. And so as Prashant rightly said that due to extension of timeline by government of India by 2 years. So there is -- the order has been slowed down. So like this year, in this 9 months, there has been 12.3 gigawatts, which has been ordered. And in this 12.3 gigawatt, we have secured Gujarat order of Sikka which is 500 megawatt, 0.5. And coming to the Power Mech part. Yes, they have got order, but if you see they are the EPC contractor and they have to collaborate with certain technology partners. And for a few of their projects, we have partnered with them and secured order in last financial year.

U
Unknown Analyst

Okay. Okay. And sir, what sort of opportunity are we looking out of this 20 gigawatts?

P
Prashant Jain
executive

So 20 gigawatt was last year, '22, '23 of that 9 months. And if we compare this year for that 9 months, it is 12.3 gigawatts.

U
Unknown Analyst

Okay. No, I'm asking what sort of opportunity pipeline for the next 2 years are we expecting? Are we eyeing for, if you can...

P
Prashant Jain
executive

Yes, I'll take that. Look -- we do not give forward statements. We have stated the market -- the opportunities in the market, and we have bids out there. The challenge that we have seen is even Gujarat Sikka, we were L1 almost a year ago. It has taken 9 months to convert that into an order. So the challenge that we are sharing is on the slow ordering and conversion of order into what we're able to book. So the run rate that is required for the company in that run rate, we do see that there are challenges. If we do book the order, let's assume even if you book an order in the coming quarter, if you take meaningfully 9 months to a year before we can convert that into revenue. So when we say the context of slower order intake, it is to explain that in the project business, unlike service business, the time to convert the order into revenue is longer, which means at least 3 to 4 quarters from booking an order we will start seeing that convert into revenue. And as Yogesh mentioned, the backlog has come down by roughly INR 200 crores. That's because we've lesser orders than the revenue that we are executing currently. And we have seen slower order intake. That's the challenge that we want to make it transparent to give you the context of what we'll be talking about.

U
Unknown Analyst

Okay sir that helps. And sir, when are we expected to be operationally positive? If you can give some color on that.

P
Prashant Jain
executive

As I said, forward forecast, we do not give as a policy. But it will be a good idea to monitor the order intake and you will get a leading indicator in the order intake and the backlog when it starts becoming meaningful. At the moment, we are running short on the run rate for revenue due to the [ repleting ] backlog of the order intake.

Operator

[Operator Instructions] Our next question is from the line of Dilip from ICICI Bank.

U
Unknown Analyst

Sir, my question is regarding for retention payments. request, if you can give some insights regarding the realization schedule of retention payments that you have?

P
Prashant Jain
executive

Sure, I would like Yogesh to share insights on that. Yogesh over to you.

Y
Yogesh Gupta
executive

Thank you, Prashant. We have our receivables of almost about 60% under retention. And these are linked to the achievement of various milestones of the project. And the year -- the quarter gone by has been very successful for us for collecting retention money and close to INR 240-odd crores have been collected on account of retention in this. And this goes up to 2027 or '26, I would say, the different milestones that will be accomplished. Normally, we don't give any forward-looking statements, but this is how the evolution of the collection against retention will happen.

U
Unknown Analyst

Okay, sir. And sir, the second question, is there any update regarding depromoterization event for GE Power India Limited?

P
Prashant Jain
executive

No, there is no update. We will disclose at the moment we have an update.

Operator

Our next question is from the line of V.P. Rajesh from Banyan Capital Advisors.

V
V.P. Rajesh
analyst

Just -- I am new to the company so I am trying to understand some numbers here. When you talk about 92% of your order book is from...

Operator

Sorry to interrupt sir. May I request to use your handset because your audio is not clear, sir.

V
V.P. Rajesh
analyst

Just one second. How about now?

Operator

Yes, sir; now you can go ahead.

V
V.P. Rajesh
analyst

My question was that with respect to -- I am new to the company, so I'm just trying to understand some numbers here. So when you talk about 92% of your order book is services, should we say this backlog of -- 92% of this backlog of INR 3,427 crores is from services. Is that the right interpretation?

P
Prashant Jain
executive

No, that's not. Thanks for raising the question. Since last couple of years, we've been sharing the development quarter-on-quarter on the order profile. And we had identified 3 areas of focus. One was to develop non-EPC business. Second was to grow services. And third was to focus on private customers and government customers. The idea was to derisk the portfolio, improve cash accretive, margin accretive profile of the order intake. So every quarter -- so this is the quarterly number. This number is for the quarter period and comparison to the quarter of previous period. And how are we faring on a scale of 100 for the order book in the current quarter. It is not on the cumulative backlog. It is the booking of the quarter and how that booking fare.

V
V.P. Rajesh
analyst

I see. So what you're saying is INR 195 crores of order booking in this particular quarter 92% is the services and 8% is in the new grid.

P
Prashant Jain
executive

Correct. That's simply because we did not book any Hydro or FGD. So the entire booking was pretty much service. That's how it is.

V
V.P. Rajesh
analyst

Right. And then the other comment, your colleague made that you are into EPC, but yet for this quarter, we see 47% is EPC. So -- what am I missing in that comment and the statement?

P
Prashant Jain
executive

No, we did not say we are not in EPC. What we said is we want to derisk the portfolio. The comment was that to explain the Power Mech booking. But the 3 orders of Power Mech, which Power Mech took as full EPC, the partner was GEPIL on an industrial project. So some of their order intake had also translated for order intake for GEPIL, unfortunately, that order is in suspension at this point in time. But it was excluding one particular transaction, which was raised by the other investor.

V
V.P. Rajesh
analyst

I see. Okay. And then just last quick question is on the GE's intention with respect to this business. I think we had talked about 3-year timeline back in fall of 2021, if my memory serves me correctly. So we are into the third year of that timeline. So do we have some clarity as to what the intent is because I've also heard that they may not want to sell this business. So I'm just curious what's the take on that point.

P
Prashant Jain
executive

Anything I say would be speculative on that. The current official position, the last disclosure that GE has made and GEPIL has made to the stock market and Kamna can clarify when we rate that probably went -- that was a couple of months ago where we have clarified the current position of GE on the topic. Kamna, you may want to bring the light to the previous disclosure we made around this topic. So that he can refer to the right documents. Yes. I think she is not on the call. We have made this disclosure, there is no change yet on the depromoterization strategy. And we -- we have also gone to the shareholders for -- that's fine. So we are also gone to the shareholders for an approval on the change of GE Vernova but that was, again, we have also clarified that has not any [indiscernible] bearing to the depromoterization strategy. So there is no change as of now to that.

Operator

Sir, we do have Ms. Kamna on the line.

P
Prashant Jain
executive

Yes Kamna, do you want to add.

Operator

[Operator Instructions] We have a follow-up question from the line of Akshay from JHP.

U
Unknown Analyst

Sir, what would be the claim amount which we are looking for?

P
Prashant Jain
executive

I think it would not be fair to speculate on an amount. Claim is complex, it has inward claims, outward claims. So to say what we can say when we mentioned claims, we have, let's take NTPC where we have Lot 1, lot 2, Lot 3 projects. NTPC has given us general amnesty after the presentation with the Ministry and NTPC management, they have given to all suppliers an amnesty of 8.5 months time extension on account of project.

Now against that time extension, there are certain claims that the company is pursuing on which we see certain amount of release that might be feasible. However, that is not adequate for the Lot 1 projects where we see that cover is not adequate yet. So this is a topic that we are working both with the ministry and with the NTPC officials and pleading our case that these are exceptional years and that has impacted negatively the performance and the delays of the projects which are not contracted for such a large tenure to keep a site on going for such a long time was not how we anticipate it. So that is the claim about prolongation in all those sites generally in all the projects. And that is a topic which -- since we are in the -- towards the end of the backlog, what is the cost updates we get, we'll see that in the quarter? But the case is where we are hoping we might get some elution -- some of the cost. But this number is -- we would detain from sharing this number until we materialize.

U
Unknown Analyst

Okay. This is different -- this is something different from the Solapur fire incident which occurred?

P
Prashant Jain
executive

Yes, this includes Solapur fire -- when we mentioned claims, it includes the insurance claims as well.

U
Unknown Analyst

Okay. Okay. And -- do you mind giving any range for us to know because it would be difficult for us to know what would be the about -- If you can give any range that would also be fine.

P
Prashant Jain
executive

It is hard to predict. These are all complex government projects unless we are able to recognize a claim, it would create speculation, and I would want to avoid speculation. We have seen conversion of claims is very slow. It has taken almost 2 years of pleading to get at least an [ intensive ] approval and thereafter submission documents. So it's a slow process. And therefore, it's hard to speculate on exact value, but that is an important element, and therefore, we share it that claims could be -- if I have to summarize the performance of the company, there will be topline pressure for a few quarters till the time we are able to turn around the order intake. And therefore, we will see operational pressure for at least 3 to 4 quarters because simply the backlog has depleted. That's something which is clear and it is evident in the books. The net worth, of course, is for you to see in the balance sheet, which is clear. That is the challenge that we are working to deal with. Interim measure is claimed till the time we are able to turn around the volume. That's the summary that I would like to share with you.

U
Unknown Analyst

Okay. Got it, sir. Sir, lastly, just your understanding on the depromoterization. When we talk about depromoterization, would it be just a partial stake sale? Or could it also mean the whole stake sale? What sort of communication are you having from the GE parent? If you can give some color on that?

P
Prashant Jain
executive

Yes. At this point, there is no decision and the options -- I mean, the options are open but we have no decision on the direction, the timing and the mode or method. So GE is evaluating that as a shareholder and that is not GEPIL management decision, that is, GE, as a shareholder and promoter and they are evaluating these options and it would be unfair on my part to speculate. So if you want to refer the latest that we intimated the stock market was on the sixth of October '23 that we have as the latest update. And that's available on public domain, you can have a look at that.

Operator

[Operator Instructions] Ladies and gentlemen, as there are no further questions, I would now like to hand the conference over to Mr. Prashant Jain, Managing Director, for closing comments.

P
Prashant Jain
executive

Thank you so much, everyone, for joining, and have a good evening. Wish you all the best.

Operator

Thank you. On behalf of GE Power India Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.