Silvercorp Metals Inc
TSX:SVM
| US |
|
Johnson & Johnson
NYSE:JNJ
|
Pharmaceuticals
|
| US |
|
Berkshire Hathaway Inc
NYSE:BRK.A
|
Financial Services
|
| US |
|
Bank of America Corp
NYSE:BAC
|
Banking
|
| US |
|
Mastercard Inc
NYSE:MA
|
Technology
|
| US |
|
UnitedHealth Group Inc
NYSE:UNH
|
Health Care
|
| US |
|
Exxon Mobil Corp
NYSE:XOM
|
Energy
|
| US |
|
Pfizer Inc
NYSE:PFE
|
Pharmaceuticals
|
| US |
|
Palantir Technologies Inc
NYSE:PLTR
|
Technology
|
| US |
|
Nike Inc
NYSE:NKE
|
Textiles, Apparel & Luxury Goods
|
| US |
|
Visa Inc
NYSE:V
|
Technology
|
| CN |
|
Alibaba Group Holding Ltd
NYSE:BABA
|
Retail
|
| US |
|
JPMorgan Chase & Co
NYSE:JPM
|
Banking
|
| US |
|
Coca-Cola Co
NYSE:KO
|
Beverages
|
| US |
|
Walmart Inc
NYSE:WMT
|
Retail
|
| US |
|
Verizon Communications Inc
NYSE:VZ
|
Telecommunication
|
| US |
|
Chevron Corp
NYSE:CVX
|
Energy
|
Utilize notes to systematically review your investment decisions. By reflecting on past outcomes, you can discern effective strategies and identify those that underperformed. This continuous feedback loop enables you to adapt and refine your approach, optimizing for future success.
Each note serves as a learning point, offering insights into your decision-making processes. Over time, you'll accumulate a personalized database of knowledge, enhancing your ability to make informed decisions quickly and effectively.
With a comprehensive record of your investment history at your fingertips, you can compare current opportunities against past experiences. This not only bolsters your confidence but also ensures that each decision is grounded in a well-documented rationale.
Do you really want to delete this note?
This action cannot be undone.
| 52 Week Range |
4.17
11.81
|
| Price Target |
|
We'll email you a reminder when the closing price reaches CAD.
Choose the stock you wish to monitor with a price alert.
|
Johnson & Johnson
NYSE:JNJ
|
US |
|
Berkshire Hathaway Inc
NYSE:BRK.A
|
US |
|
Bank of America Corp
NYSE:BAC
|
US |
|
Mastercard Inc
NYSE:MA
|
US |
|
UnitedHealth Group Inc
NYSE:UNH
|
US |
|
Exxon Mobil Corp
NYSE:XOM
|
US |
|
Pfizer Inc
NYSE:PFE
|
US |
|
Palantir Technologies Inc
NYSE:PLTR
|
US |
|
Nike Inc
NYSE:NKE
|
US |
|
Visa Inc
NYSE:V
|
US |
|
Alibaba Group Holding Ltd
NYSE:BABA
|
CN |
|
JPMorgan Chase & Co
NYSE:JPM
|
US |
|
Coca-Cola Co
NYSE:KO
|
US |
|
Walmart Inc
NYSE:WMT
|
US |
|
Verizon Communications Inc
NYSE:VZ
|
US |
|
Chevron Corp
NYSE:CVX
|
US |
This alert will be permanently deleted.
Q2-2026 Earnings Call
AI Summary
Earnings Call on Nov 7, 2025
Revenue Surge: Silvercorp reported Q2 revenue of $83 million, up 23% from last year, marking its second highest quarter ever.
Cash Flow Growth: Cash flow from operating activities rose 69% year-over-year to $39 million, driven by higher realized selling prices and stronger gold sales.
Net Income Impacted: Net income was negative $11.5 million due to a significant $53 million noncash charge, but adjusted net income was $22.6 million, up from last year.
Production Mixed: Silver production was flat, gold production jumped 76%, and lead was up 8%, though zinc fell 3%.
Cost Trends: Production costs at Ying mine dropped 11% per tonne but all-in sustaining costs per silver ounce increased by 30% due to royalties and higher sustaining capital.
Guidance Catch-Up: Management expects a strong Q3 at Ying to help catch up with full-year production guidance after Q2 setbacks.
Project Progress: Construction in Ecuador at El Domo is ramping up after early delays, with significant capital deployed and key contracts awarded.
The company delivered strong revenue growth in Q2, primarily due to higher realized selling prices for silver and gold, which rose 28% and 37% respectively. A notable increase in gold sold (up 64%) also contributed. Silver remained the largest revenue source, accounting for about 67% of net revenue.
Despite strong operational performance, net income was negative $11.5 million due to a large $53 million noncash charge on derivative liabilities, partially offset by a $22 million gain on investments. Adjusted net income, excluding these items, was $22.6 million, an increase from the prior year.
Silver production was essentially flat for the quarter, while gold production rose 76% and lead production was up 8%. Zinc production declined by 3%. Year-to-date, silver, gold, and lead outputs were up compared to last year, while zinc was down.
Production costs at the Ying mine averaged $83 per tonne, down 11% from last year, helped by increased mechanization and higher throughput. However, cash cost per ounce of silver and all-in sustaining costs were higher, mainly due to increased royalties, sustaining capital expenditures, and higher dilution from mining methods.
Significant investments were made in both China and Ecuador. At the Ying mine, expansion and permit renewals are expected to increase capacity. Construction at the El Domo project in Ecuador accelerated after early weather-related delays, with major contracts awarded and substantial capital committed. Work continues at the Condor Gold project, with permit applications underway.
Management acknowledged that Q3 will be a 'catch-up' quarter at Ying due to Q2 setbacks and expects ramped-up production, but they remain cautious about the ability to fully make up for earlier shortfalls. There is still uncertainty about Q4 output due to seasonal factors.
The company maintains a strong cash position of $382 million, not including $180 million in investments. Silvercorp drew the first $43.9 million tranche from its $175.5 million Wheaton Precious Metals streaming facility to fund El Domo construction, reflecting limited renegotiation flexibility.
Good morning, and thank you for standing by. My name is Ludy, and I will be your conference operator today. At this time, I would like to welcome everyone to the Silvercorp's Second Quarter Fiscal 2026 Financial Results Conference Call. [Operator Instructions]
I would now like to turn the conference over to Lon Shaver, President of Silvercorp. Please go ahead.
Thank you, Ludy. On behalf of Silvercorp, I'd like to welcome everyone to this call to discuss our second quarter fiscal 2026 financial results. They were released yesterday after the market closed and a copy of our news release, MD&A and financial statements are available on our website and SEDAR+.
Before we get going, please note that certain statements on today's call will contain forward-looking information within the meaning of securities laws. And also please review the cautionary statements in our news release as well as the risk factors described in our most recent regulatory filings.
So let's kick off the call with our financial results. We delivered more solid performance in Q2 highlighted by our revenues of $83 million, which was up 23% from last year and marks the second highest quarter ever. Additionally, cash flow from operating activities was $39 million, and that was up 69% from last year. This performance was mainly driven by a 28% and 37% rise in the realized selling prices for silver and gold compared to last year. Also notably, the amount of gold sold in the quarter was up 64% compared to last year. Silver remains our most significant revenue contributor at approximately 67% of net Q2 revenue, followed by lead at 16% and gold at 7%.
Moving down the income statement. We reported net income of negative $11.5 million for the quarter or negative $0.05 per share. This is down from positive $17.8 million or $0.09 a share in Q2 of fiscal 2025. However, this quarter had a significant $53 million noncash charge on the fair value of derivative liabilities, which was partially offset by a $22 million gain on investments. Removing noncash and onetime items such as this, our adjusted net income for the quarter was $22.6 million or $0.10 a share versus $17.7 million or $0.09 a share in the comparative quarter. Note that the average shares outstanding used to calculate EPS this quarter was 218.6 million compared to 206.5 million in the same period last year.
On the capital spending side, we invested nearly $16 million at our operations in China and $11 million in Ecuador during the quarter. We generated $11 million in free cash flow for the quarter, which supported our strong closing cash position of $382 million. This cash position does not include our investments in associates and other companies, which had a total market value of $180 million on September 30. And after quarter end, we participated in New Pacific Metals equity financing and acquired an additional 3 million common shares for roughly $7.8 million.
Also, subsequent to quarter end, in October, we made the first draw on our $175.5 million Wheaton Precious Metals streaming facility for the El Domo project. We drew down the first $43.9 million tranche, which will be used to fund our ongoing construction at El Domo.
Now to just quickly recap our operating results. As we reported last month, in Q2, we produced approximately 1.7 million ounces of silver, just over 2,000 ounces of gold, 14 million pounds of lead and 6 million pounds of zinc. Silver production was essentially flat, but gold production was up 76%. So silver equivalent production, considering just the silver and gold was up 5%. Lead production was up 8% and zinc production was down 3%.
Production at Ying was impacted by the temporary closure of certain mining areas, which have since reopened. We expect to mine approximately 346,000 tonnes of ore in this current quarter Q3 compared to the 265,000 tonnes mined in Q2. At the GC mine, production in Q2 was interrupted for about 10 days by Typhoon Ragasa. Year-to-date, we have produced 3.5 million ounces of silver, 4,135 ounces of gold, 30 million pounds of lead and 11 million pounds of zinc, which represents increases relative to last year of 3%, 78% and 4%, respectively, in silver, gold and lead production and an 11% decrease in zinc production.
On the cost side, Q2 production costs averaged $83 per tonne at Ying which was down 11% from last year. The improvement reflects greater use of shrinkage stoping over the more labor-intensive cut-and-fill resuing method along with higher ore throughput. Year-to-date production costs also averaged $83 per tonne, which was below the Ying annual guidance of between $87 to $88 per tonne. Ying's cash cost per ounce of silver net of byproduct credits was $0.97 in Q2 compared to $0.62 in the prior year quarter. The increase was driven by a $4 million increase in production costs due to 26% more ore being processed, while silver production grew by only 1% as shrinkage mining tends to have higher dilution rates. This was partially offset by a $3 million increase in byproduct credits.
Q2 all-in sustaining cost per ounce net of byproduct credits was $11.75 at Ying, up 30% from the prior year quarter due to a $1.4 million increase in mineral rights royalties following its implementation in China in Q3 of fiscal 2025. A $2.6 million increase in sustaining CapEx and those previously mentioned factors that impacted cash costs.
Overall, for the operations, consolidated mining operating income came at $40.8 million in Q2, with Ying contributing $38 million of that or over 93% of the total.
Turning to our growth projects. At Ying, we invested $6 million in the quarter for ramp and tunnel development to enhance underground access and increased material handling capabilities. This work goes hand-in-hand with our efforts to expand mining capacity across the 4 licenses at Ying. Recall that last year, the SGX mine permit was renewed for another 11 years with capacity increase to 500,000 tonnes per year. The HPG permit was also renewed and expanded to 120,000 tonnes and the DCG permit was increased to 100,000 tonnes. We're now in the process of applying to increase the TLP LM permit to 600,000 tonnes per year with approval expected later this quarter.
Once all approvals are in place, Ying's total permitted annual mining capacity will rise to 1.32 million tonnes from approximately 1 million tonnes currently. At Kuanping, that's the satellite project north of Ying, mine construction continued with 831 meters of [ ramp ] development and 613 meters of exploration tunnelling completed in this quarter. Kuanping has a mining permit to produce 200,000 tonnes per year, which at a full contribution, would bring our total mining capacity at Ying up to 1.52 million tonnes per year.
Switching to Ecuador. Construction at the El Domo project is moving ahead steadily. In Q2, around 1.29 million cubic meters of material work cut for site preparation. Roads and channels, and that was a roughly 250% increase over the previous quarter. A 481-bed construction camp has been completed and work on the tailings storage facility began in September. For the 6 months ended September 30, approximately 1.66 million cubic meters of material were cut or removed, and $14.6 million of expenditures were capitalized.
Contracts for 4 sections of the external power line have been awarded to qualified Ecuadorian contractors, pending review by the state power distributor, CNEL. Additionally, orders for equipment with a total value of $22.2 million have been placed.
Overall, since January of this year, approximately $18.9 million has been spent on capital expenditures and prepayments for equipment purchases related to El Domo.
At the Condor Gold project, we kicked off the [ PEA ] for an underground gold operation and expect to complete this study before the end of the year. As a reminder, at Condor, our plan is to construct 2 exploration tunnels into the deposits, which will allow us to conduct underground detailed drilling. In order to do this, we required environmental license and water permits. The studies to support these applications have been ongoing over the year. And during the quarter, we submitted our application for the water permits. The application is now pending final approval. We have submitted our application for the environmental license, and it is under review by the relevant authorities.
And with those updates, I'd like to open the call for questions.
[Operator Instructions] With that, our first question comes from the line of Joseph Reagor with ROTH Capital Partners.
I guess first thing on El Domo, the guide for CapEx compared to what you spent year-to-date, is it a matter of -- there's a big lift coming here soon or some long lead items that you guys have to pay for? Or is it -- are things maybe tracking a little slower than anticipated as far as capital spending goes?
I was probably tracking a little slower initially. We began construction this year focusing on earthworks, and it was clearly a wetter year than Ecuador has experienced in past rainy seasons. But I think we've ramped up significantly here in recent months as indicated by the results that we published this quarter. And going forward, we should be able to provide an update on our construction progress this quarter, particularly as we are looking to execute the contract for bid package #2 in due course. And that's obviously the contract associated with stripping of the open pit and actually mining of the deposit. And we'll be in the position here shortly to share results from the metallurgical testing program that we've undertaken this year. So we expect to have an update prior to year-end where we can bring all these items forward and provide any updates.
Okay. And also on El Domo with the Wheaton drawdown, I think initially, when you guys made the acquisition, there was some thought that there was a potential to maybe buy that stream out or not use it in some way, but now you've drawn down on it. Does that just reflect that there was no way to really negotiate out of it given gold and silver prices have moved so positively since it was signed?
Well, I think your last comment really indicates what we'd be dealing with to renegotiate. There was contractually an opportunity to adjust the stream at the time of the acquisition. It didn't make sense at the time, and it still doesn't make sense based off of those numbers. What might be available to negotiate with Wheaton, I can't comment on. You'd have to speak to them as well in terms of what their expectations are based on the contract that they entered into with Adventus.
Okay. Fair enough. And then just on guidance, it sounds like you guys are expecting a pretty strong catch-up quarter at Ying in Q3 and that, that will get you back in line with guidance, whereas if you were operating at normal rates, you'd kind of be tracking a little below after the Q2, let's call it, issue for lack of a better word.
Yes. I mean, clearly, Ying is a mine in transition as we look to increase mechanization, we've certainly been demonstrating other than the temporary setback in this last quarter, the ability to generate tonnes. So that has been ramping up nicely. Also, we've been able to deliver more tonnes and produce more gold. So that is a bit of a shift in the profile. But whether we're able to make up for what was missed in so far this year, a little early to tell. I think it will depend on our ability to run at those expanded rates, great profile going forward and also Q4, just -- last year, we had some excess tonnes and we had a brand-new mill with excess capacity to work through those. So it kind of remains to be seen what we can push through in Q4 to get away from what has seasonally been a slower quarter. So still a bit early to tell. But as you point out, we're in a bit of a catch-up mode here.
[Operator Instructions] And we have no further questions at this time. I would like to turn it back to Lon Shaver for closing remarks.
Okay. Well, great. Thanks, operator, and thanks, everyone, for joining us today. If anyone does have any further questions after the call, please feel free to reach out by calling or e-mailing us. We look forward to hearing from you, and we look forward to catching up to discuss the results of our third quarter. Thanks, everyone, and have a great day.
And ladies and gentlemen, this concludes today's conference call. Thank you all for joining. You may now disconnect.